Hvac Replacement At Allentown Rc
Bids closed Apr 2026 · Pennsylvania · Last reported Mar 2026
Source: Pennsylvania Purchasing Group
1 . Prepare and submit all necessary pre - construction documentation as outlined within the project Design Documents . 2 . Outline individual construction tasks / milestones and provide Construction Schedule that includes the work of all other Prime Contractors . 3 . Remove and dispose of the existing ceiling grid and
- Status
- Closed
- Sector
- Cement
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about Hvac Replacement At Allentown Rc
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Prepare and submit all necessary pre - construction documentation as outlined within the project Design Documents . 2 . Outline individual construction tasks / milestones and provide Construction Schedule that includes the work of all other Prime Contractors . 3 . Remove and dispose of the existing ceiling grid and tile for the replacement of the new HVAC system per the project design documents . 5 . Saw cut opening in concrete floor on second floor where indicated on existing floor plan sheet A1 . 1 for the installation of a fire damper and air supply chase between the first floor above drop ceiling space and above the second floor drop ceiling space . 6 . Install air supply chase on the second floor where indicated on the existing floor plan sheet A1 . 1 . 7 . Coordinate with HVAC ( lead ) contractor for the location of the new HVAC RTU roof curbing and coordinate with the existing roofing manufacturer to properly flash and seal the new curb without voiding current roof warranty . 8 . Install new acoustical ceiling grid system in coordination with the HVAC ( lead ) contractor . 9 . Install new acoustical ceiling tiles in coordination with the HVAC ( lead ) contractor . 10 . Remove gypsum board ceiling in secured storage room for the replacement of the new HVAC system . 11 . Install new gypsum board ceiling in coordination with the HVAC ( lead ) contractor . 12 . Complete Punch Lists Items and perform Final Cleaning . 13 . Provide all required closeout documentation and training per the Project Design Documents prior to deeming / granting the project complete |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Cement |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Horsehaven Creek Culvert Replacement Project D230
- 23B49SR Marine Science Center Turtle Canopy
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- SAC Building 10318 Exterior Paint
- Fire Station 32 ADA Restroom Improvements
