logo

Hvac Replacement At Uscg Sta Washington

Sector: Commercial • Location: Bolling AFB, District of Columbia, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

HVAC replacemet in accordance with the Attached SOW, to include: a. Determine heat load calculations for the HVAC system using installed ducting system. Use heat load calculations to determine an appropriate size/capacity for indoor and outdoor units utilizing installed ducting. Provide owner with a written copy of load calculations. If it is determined that any duct work needs to be modified, cha

Status
Prospective
Sector
Commercial, Residential
Location
Bolling AFB, District of Columbia, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Hvac Replacement At Uscg Sta Washington

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Hvac Replacement At Uscg Sta Washington” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Bolling AFB, District of Columbia, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

HVAC replacemet in accordance with the Attached SOW, to include: a. Determine heat load calculations for the HVAC system using installed ducting system. Use heat load calculations to determine an appropriate size/capacity for indoor and outdoor units utilizing installed ducting. Provide owner with a written copy of load calculations. If it is determined that any duct work needs to be modified, changed or resized in any way due to the heat load calculations, contractor shall provide and install. New unit shall be EPA approved A2L based refrigerant either R-454B or R-32, preferably R-454B. Contractor shall pull and entire new line-set to include new suction lines and liquid lines that run from heat pump to air handler. Contractor shall install a new liquid line drier for each circuit and locate the new liquid line drier indoors near the air handler to prevent unnecessary corrosion from outside elements. b. Remove and dispose of the current outdoor and indoor units. Unit will not have refrigerant in it. c. Replace wiring and conduit from existing service disconnects to new pieces of equipment. Replace any corroded or damaged conduit or wiring found during the demo of existing equipment. If disconnects are not fused, then contractor shall replace any and all associated disconnects with new fused ones. d. Replace all thermostat control wiring inside and outside with new UV rated wire. Provide and replace existing thermostat to match the system function.

Original sector

Construction

Location

Country

United States of America (USA)

State

District of Columbia

City

Bolling AFB

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Commercial, Residential

Article published date

2026-04-24

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender