Hydrogeological Conceptualisation and Environmental Risk Assessment
Sector: Water Supply and Storage • Location: United Kingdom
Source: Contracts Finder
This Procurement has been awarded via the CCS Management Consultancy Framework 4 (RM6309) The contract type which has been used is the CCS PCS contract and it has been offered on a five year term with an optional two years. For transparency, the quoted Contract value figures are estimated for the full seven years and have been adjusted with an estimation of inflation.The Inland Saline Mine Water P
- Status
- Closed
- Sector
- Water Supply and Storage, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Contracts Finder
ConstructChat
Ask ConstructChat about Hydrogeological Conceptualisation and Environmental Risk Assessment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded contract |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Procurement has been awarded via the CCS Management Consultancy Framework 4 (RM6309) The contract type which has been used is the CCS PCS contract and it has been offered on a five year term with an optional two years. For transparency, the quoted Contract value figures are estimated for the full seven years and have been adjusted with an estimation of inflation.The Inland Saline Mine Water Programme (ISMWP) has developed a process called 'Block to Scheme' (BtS) to understand what treatment solution is needed for each block in the programme. There are several steps in BtS from data gathering to risk assessment and management strategy.This contract is for conceptualisation, discharge zone and risk assessment which are key steps that will enable the blocks to be prioritised in order of risk, where the risk is determined by the quality and volume of mine water impacting water courses or aquifers and the impact date.The conceptualisation of each block will enable understanding of the rate of rise of the mine water, where it may discharge and when.The discharge zone assessment reviews local watercourses and reports on their ability to receive discharges from the blocks.These 3 activities were aggregated together to ensure one consultant was responsible for the data analysis, streamlining delivery and achieving value for money |
Location
Country | United Kingdom (UK) |
Source
Source | Contracts Finder |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road |
Article published date | 2026-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
