logo

IA_IRM ROV_26-34_FA

Sector: Oil and Gas • Location: Denmark

Source: TED Europa

Tender
Contract Award Notice

Ørsted are planning for a new frame agreement with bi-annual ROV inspection with planned call-offs in 2027-2029-2031 optional 2033, but not limited to call-off in these specific years. The ROV IRM scope will be at the two Ørsted owned and operated 24” and 30” offshore gas pipelines including subsea structures, risers and spools and the 20” offshore oil pipeline. 2.3.5 Inspection services. Contract

Status
Closed
Sector
Oil and Gas
Location
Denmark
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about IA_IRM ROV_26-34_FA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “IA IRM ROV 26-34 FA” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Denmark.

Participants

Not available for this record.

Status

Original status

contract award notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Ørsted are planning for a new frame agreement with bi-annual ROV inspection with planned call-offs in 2027-2029-2031 optional 2033, but not limited to call-off in these specific years. The ROV IRM scope will be at the two Ørsted owned and operated 24” and 30” offshore gas pipelines including subsea structures, risers and spools and the 20” offshore oil pipeline. 2.3.5 Inspection services. Contractor shall perform inspections including but not limited to: IRM ROV inspection work according to Ørsted, inspections Sheets, Visual Inspection, CP stabbing, Cleaning of Marine Growth. And optional but not limited to scope for: Removal of seabed objects, Flooded member detection (FMD), FIGS pipeline and structure CP task, Other ROV task. Please note, that above scope is preliminary and a subject of change. The scope / tasks are not limited to above. The final scope will be defined in each call-off. Contractor shall perform the work in accordance with the procedures, specifications and re-quirements set out in Ørsted but not limited to this. In undertaking this work Contractor shall engineer his activities in such a way, that it will include all and any on- and offshore work required to perform the scope of work. Expected duration for execution including mobilization and demobilization per call-off is 5 – 10 days. Vessel and equipment: Vessel that can operate safely in the North Sea area, Operation and management of DP2 ROV support vessels, Vessel that can be approved an operated after Marine Operation Procedures (TotalEnergies, INEOS, and Ørsted), ROVS onboard: WROV, OROV and Mini ROV, High pressure subsea cleaning equipment.

Original sector

Services related to the oil and gas industry, Supporting and auxiliary transport services; travel agencies services

Location

Country

Denmark

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Oil and Gas

Article published date

2026-08-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender