logo

Iberia , MO - Sanitary Sewer Collection System Improvements Project - Contract No . 2

Sector: Water Supply and Storage • Location: Missouri, United States of America

Source: Missouri Purchasing Group

Tender
Closed

The projects consist of : Gravity Sewer Extensions and Grinder Station Abandonment : Installing seven ( 7 ) new sewer lines including removing and replacing approximately 1 , 210 LF of 8 pipe , installing approximately 3 , 985 LF of 8 pipe , removing and replacing 10 manholes , installing 26 manholes , 104 LF bore an

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Iberia , MO - Sanitary Sewer Collection System Improvements Project - Contract No . 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Iberia , MO - Sanitary Sewer Collection System Improvements Project - Contract No . 2” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The projects consist of : Gravity Sewer Extensions and Grinder Station Abandonment : Installing seven ( 7 ) new sewer lines including removing and replacing approximately 1 , 210 LF of 8 pipe , installing approximately 3 , 985 LF of 8 pipe , removing and replacing 10 manholes , installing 26 manholes , 104 LF bore and casing for 8 pipe , installing approximately 1 , 820 LF of service lateral , abandoning 16 grinder pumps and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Grinder Pump Replacements : Removing and replacing one duplex grinder pump system and six simplex grinder pumps as indicated on the construction drawings and as directed by the Owner . Sewer Interceptor Improvements : Removing and replacing approximately 651 LF of 8 pipe and installing 12 pipe , remove and replace 3 manholes and one flared end section and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Force Main Improvements : Installing approximately 3 , 783 LF of 8 PVC force main pipe , abandonment of two existing 6 force mains , 57 LF bore and casing for 8 pipe and coordinating with Contract 1 Contractor for force main improvements tie in to lift station improvements . Collection System Rehabilitation : Approximately 3 , 270 LF of 8 CIPP lining , 24 CIPP service lateral liners , 7 point repairs , 19 cover and frame replacements , 103 replacement of frame seal and external wraps , 77 VF of epoxy lining , 195 VF of curtain grouting , 5 bench and invert rehabilitations and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Bids will be received for a single prime contract . Bids shall be on a lump sum and unit price basis , with additive alternate bid items as indicated in the Bid Form .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Waste Processing and Treatment

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender