Iberia , MO - Sanitary Sewer Collection System Improvements Project - Contract No . 2
Sector: Water Supply and Storage • Location: Missouri, United States of America
Source: Missouri Purchasing Group
The projects consist of : Gravity Sewer Extensions and Grinder Station Abandonment : Installing seven ( 7 ) new sewer lines including removing and replacing approximately 1 , 210 LF of 8 pipe , installing approximately 3 , 985 LF of 8 pipe , removing and replacing 10 manholes , installing 26 manholes , 104 LF bore an
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Iberia , MO - Sanitary Sewer Collection System Improvements Project - Contract No . 2
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The projects consist of : Gravity Sewer Extensions and Grinder Station Abandonment : Installing seven ( 7 ) new sewer lines including removing and replacing approximately 1 , 210 LF of 8 pipe , installing approximately 3 , 985 LF of 8 pipe , removing and replacing 10 manholes , installing 26 manholes , 104 LF bore and casing for 8 pipe , installing approximately 1 , 820 LF of service lateral , abandoning 16 grinder pumps and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Grinder Pump Replacements : Removing and replacing one duplex grinder pump system and six simplex grinder pumps as indicated on the construction drawings and as directed by the Owner . Sewer Interceptor Improvements : Removing and replacing approximately 651 LF of 8 pipe and installing 12 pipe , remove and replace 3 manholes and one flared end section and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Force Main Improvements : Installing approximately 3 , 783 LF of 8 PVC force main pipe , abandonment of two existing 6 force mains , 57 LF bore and casing for 8 pipe and coordinating with Contract 1 Contractor for force main improvements tie in to lift station improvements . Collection System Rehabilitation : Approximately 3 , 270 LF of 8 CIPP lining , 24 CIPP service lateral liners , 7 point repairs , 19 cover and frame replacements , 103 replacement of frame seal and external wraps , 77 VF of epoxy lining , 195 VF of curtain grouting , 5 bench and invert rehabilitations and other miscellaneous work as indicated on the construction drawings and as directed by the Owner . Bids will be received for a single prime contract . Bids shall be on a lump sum and unit price basis , with additive alternate bid items as indicated in the Bid Form . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Waste Processing and Treatment |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
