Ida Middle School Lab Wiring
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
Ida Public Schools is considering purchasing Ethernet infrastructure upgrades to support improved internet connectivity . Project Scope Ida Middle School – Computer Lab IDF Relocation • Replace all existing network wiring to a newly installed network cabinet . o The new cabinet is located directly below the existin
- Status
- Closed
- Sector
- Broadband, Telecommunications, Metal, Commercial, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Ida Middle School Lab Wiring
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Ida Public Schools is considering purchasing Ethernet infrastructure upgrades to support improved internet connectivity . Project Scope Ida Middle School – Computer Lab IDF Relocation • Replace all existing network wiring to a newly installed network cabinet . o The new cabinet is located directly below the existing cabinet and has already been installed . • Remove all existing Ethernet wiring and replace with new wiring and terminations . • Remove the old network rack and all unused conduits and boxes . Ethernet Drops • Network drops to be replaced : 73 • Additional drops requested : 5 ( locations to be determined during installation ) • Total Ethernet drops : 78 Conduit Requirements • Replace all plastic conduits . • Install heavy - duty metal conduit where required . • Existing metal conduit in good condition may be reused . Materials to Include in Bid • All required conduit • New junction boxes • Plenum - rated Cat6 cable • Cat6 keystone termination jacks IDF Cabinet Materials : • Qty 4 – 19 - inch rack - mounted Cat6 patch panels o Preference : 24 - port keystone insert patch panels o Example : Leviton 49255 - H24 QuickPort Patch Panel • All exposed cabling from the ceiling to the network rack must be enclosed in conduit or pipe for protection and a clean , finished appearance Labor Requirements • Remove all old wiring , unused conduits , old rack , and patch panels • Install , label , and terminate all new Cat6 wiring • Label , test , and verify each port using a certification testing tool Additional Requirements : • Cat6 wiring must be plenum - rated • Blue cable preferred Fiber & Network Equipment • Fiber connections include service loops and can be relocated without re - splicing • Existing fiber patch panel will be reused • Ida Public Schools IT Department will : o Relocate fiber connections o Rack and configure network switching equipment o Provide all Ethernet patch cables |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Broadband, Telecommunications, Metal, Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
