Idaho - Camp Sweyolakan Water System Improvements
The scope, dates and status of this tender. A free account opens every field.
Source: Idaho Purchasing Group
Schedule A – Intake System , Booster Station , and Treatment Facility : Replacement of existing intake system including pumps , piping , and fittings ; upgrades to existing treatment facility including filter replacement , mechanical piping and fitting replacement , and installation of two new final filters replacement of ex
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- Idaho Purchasing Group
ConstructChat
Ask ConstructChat about Idaho - Camp Sweyolakan Water System Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Schedule A – Intake System , Booster Station , and Treatment Facility : Replacement of existing intake system including pumps , piping , and fittings ; upgrades to existing treatment facility including filter replacement , mechanical piping and fitting replacement , and installation of two new final filters replacement of existing booster station including booster pumps , mechanical piping and fittings , and building structure ; and installation of new lower reservoir including tanks and piping . Schedule B – Lower Distribution : Distribution upgrades from the booster station to the lower portion of the camp ( past the Lodge and Tamarack ), including replacement of existing water piping and fittings and installation of new yard hydrants . Schedule C – Upper Reservoir Distribution : Distribution upgrades from the booster station to the existing upper reservoir , including replacement of existing water piping and fittings and installation of new yard hydrants . Schedule D – Upper Distribution : Distribution upgrades from the upper reservoir water line to the upper distribution area ( from Connemara to Echo ), including replacement of existing water piping and fittings and installation of new yard hydrants . Schedule E – Reservoir Coating : Re - coating the exterior of the existing upper reservoir and appurtenances . Schedule F – Backup Generator : Installation of a standby generator . Areas of work include : survey , electrical , control system , seeding , aggregate , piping and appurtenances , reservoir coatings , etc . |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Idaho Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
