logo

Idiq Boundary Maintenance Beaver Lake Project

Combined synopsis/solicitation · Beaver Lake Project 2260 N. 2nd Street, Rogers, AR

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

The Contractor shall furnish all labor, equipment, materials, tools and supplies, except as otherwise provided for herein, required to perform clearing and marking of surveyed boundary lines of Government property surrounding Beaver Lake. The contractor is required to identify and document any trespass and encroachment activities found on Government property as service is performed. Information on

Status
Prospective
Sector
Residential, Waste Processing and Treatment, Government, Commercial, Aerospace & Defense, Road
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Idiq Boundary Maintenance Beaver Lake Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Idiq Boundary Maintenance Beaver Lake Project” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to Beaver Lake Project 2260 N. 2nd Street, Rogers, AR.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Contractor shall furnish all labor, equipment, materials, tools and supplies, except as otherwise provided for herein, required to perform clearing and marking of surveyed boundary lines of Government property surrounding Beaver Lake. The contractor is required to identify and document any trespass and encroachment activities found on Government property as service is performed. Information on trespasses and encroachments found are reported on weekly reports. The Government shall have work performed by the contractor through the issue of delivery orders. The Government shall provide a Scope of Work (SOW) to the Contractor. The Scope of Work will list locations and the work requirements that need to be performed by the Contractor utilizing the firm fixed priced CLINs in the contract. After the Government determines the work to be performed, the Contracting Officer shall issue a Delivery order for the firm fixed price amount and send the document to the Contractor. No work shall be performed on the requirement prior to the Contractor receiving this document. Please see the attached Combined Synopsis/Solicitation document. The purpose of Amendment 0001 is to Change recency years from 3 years to 6 years in RFO provision 52.212-2, Provide updated RFO provision 52.229-11, Provide updated RFO clause 52.229-12, Include Site Visit Attendance List, Include Questions and Answers, Incorporate revised Service Contract Wage Determination 2015-5723 revision 31 dated 30 July 2026 and supersedes all other versions, Provide corrected Performance Work Statement to reflect correction in section 5.4.

Original sector

Administrative and Support and Waste Management and Remediation Services

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Residential, Waste Processing and Treatment, Government, Commercial, Aerospace & Defense, Road

Article published date

2026-08-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender