logo

IFB - 2026 - CP - 2606 63 Spaulding Ave Roof Replacement

The scope, dates and status of this tender. A free account opens every field.

Source: Pueblo West Metropolitan District - Colorado

Tender
Closed

This project shall include all necessary labor , supervision , equipment , tools , and materials for the completion of roof replacement and repair work on Areas A , B & C in accordance withthe attached construction drawings . Area A will require the removal and disposal of all layers of existing modified bitumen

Status
Closed
Sector
Water Supply and Storage, Metal, Power Generation (CCGT), Commercial
Location
Pueblo West, Colorado, United States of America
Updated
3 Nov 2026
Source
Pueblo West Metropolitan District - Colorado

ConstructChat

Ask ConstructChat about IFB - 2026 - CP - 2606 63 Spaulding Ave Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “IFB - 2026 - CP - 2606 63 Spaulding Ave Roof Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Pueblo West, Colorado, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This project shall include all necessary labor , supervision , equipment , tools , and materials for the completion of roof replacement and repair work on Areas A , B & C in accordance withthe attached construction drawings . Area A will require the removal and disposal of all layers of existing modified bitumen roofing followed by the installation of a new Induction Welded TPO roof membrane over R - 30 Insulation . Areas B & C require new Induction Welded TPO roof membrane over existing EPS Insulation and replacement of base flashing . Existing ballast rock shall be reused in these areas . Work also includes removal and replacement of all metal cap flashings , modifications to drainage scuppers & modifications to the existing MEP equipment located atop Area A in accordance with the attached construction drawings and specifications . All dimensions and scope of work shall be verified by contractors prior to submission of bids . This Project will require the assistance of an licensed electrician and a licensed mechanical contractor to properly complete the roof replacement . All electrical and mechanical work ( adjustments , relocations , disconnects & reconnects ) associated with electrical conduit , boxes , gas lines and equipment work must be completed by a licensed and insured commercial electrician and / or mechanical contractor . The costfor this work must be included in the bid . Contractor to closely coordinate interruptions in power / service with PWMD Project Manager as to not negatively affect the occupants of the building . All work shall be done in a thorough workman - like manner in accordance with current Pueblo County Building Division Codes and Regulations . Area A shall consist of : 1 . All labor , equipment , supplies , materials , and all other costs related to the successful completionof the project . 2 . Remove and dispose of existing sheet metal cap flashings . 3 . Remove and dispose of all layers of existing modified bitumen roofing , exposing the structuralwood deck . Inspect existing deck for damage . Notify PWMD of any damaged deckingimmediately . Photo - document ( before & after ) and replace damaged wood decking with matchingmaterial . 4 . Contractor shall enlist the services of a licensed electrician to relocate the electrical conduitcurrently powering the RTU located on Area A . Conduit should be relocated so as not to obstructcricket valleys or water flow to drainage points . 5 . Enlarge existing NW corner drainage opening to allow for new scupper flashing sleeve per theattached construction drawings . 6 . Inspect abandoned NE collector head & downspout location . If drainage opening is present & scupper location can be used , please refer to Alternate 1 on roof plan . ( If scupper cannot beused , remove and dispose of existing collector head & downspout . Mechanically fasten new 24 - gauge sheet metal cover plate set in bed of high - grade sealant . Paint new cover plate to matchsurrounding conditions .) 7 . Install 2 layers of 20 psi Polyiso ( CGF ) insulation , mechanically fastened to the wood deck . 8 . Install ½ ” / ft . tapered sumps & 1 ” / ft . tapered crickets in accordance with the attachedconstruction drawings . 9 . Contractor shall enlist the services of licensed MEP contactor to raise rooftopequipment / ductwork as / if needed to allow for 8 ” minimum flashing height . 10 . Mechanically fasten ½ ” Polyiso HD cover board at inside face of all 4 parapet walls . HD board toextend from top of roof insulation to the top of parapet . 11 . Install 60 mil TPO roof membrane ( white ) induction welded per manufacturer requirements . 12 . Install 60 mil TPO base flashings ( white ) fully adhered per manufacturer requirements . 13 . Furnish and install new dura - block pipe supports as required to support gas line & electricalconduit . Remove and dispose of any cinderblock / improvised pipe supports . Set new pipesupports on protection layer of TPO roof membrane . 14 . Install new TPO walkway pads in areas indicated on roof plan . 15 . Install new 24 - gauge prefinished cap flashings , PWMD to choose from manufacturer ’ s standardcolors . Exterior face of new cap flashing shall be long enough to cover any existing “ paint - lines ” that may have been left during removal of old cap flashing . 16 . Remove all trash related to roof replacement daily and upon project completion . 17 . Provide a 2 - year workmanship warranty and a 20 - year NDL Manufacturer ’ s warranty coveringmaterials and labor . Areas B & C1 . All labor , equipment , supplies , materials , and all other costs related to the successful completionof the project . 2 . Remove and dispose of existing sheet metal cap flashings . 3 . Remove and reserve ballast surfacing as required to expose roof membrane . 4 . Remove and dispose of existing roof membrane , exposing the ½ ” EPS insulation board below . Notify PWMD of any broken or damaged EPS board immediately . Photo - document ( before & after ) and replace EPS board as needed . 5 . Install ½ ” / ft . tapered EPS crickets in accordance with the construction drawings . 6 . Install 60 mil TPO roof membrane ( white ) loose laid for ballasted application . 7 . Install 60 mil TPO base flashings ( white ) fully adhered per manufacturer requirements . 8 . Install protection mat over new installed roof membrane . 9 . Redistribute ballast surfacing over newly installed protection mat & roof membrane . New roofmembrane must be adequately ballasted at the end of each workday . 10 . Install new 24 - gauge prefinished cap flashings , PWMD to choose from manufacturer ’ s standardcolors . Exterior face of new cap flashing shall be long enough to cover any existing “ paint - lines ” that may have been left during removal of old cap flashing . 11 . Remove all trash related to roof replacement daily and at project completion . Provide a 2 - year workmanship warranty and a 20 - year NDL Manufacturer ’ s warranty covering materialsand labor . See more

Location

Country

United States of America (USA)

State

Colorado

City

Pueblo West

Source

Source

Pueblo West Metropolitan District - Colorado

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Metal, Power Generation (CCGT), Commercial

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender