IFB - 2026 - CP - 2606 63 Spaulding Ave Roof Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: Pueblo West Metropolitan District - Colorado
This project shall include all necessary labor , supervision , equipment , tools , and materials for the completion of roof replacement and repair work on Areas A , B & C in accordance withthe attached construction drawings . Area A will require the removal and disposal of all layers of existing modified bitumen
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Power Generation (CCGT), Commercial
- Location
- Pueblo West, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- Pueblo West Metropolitan District - Colorado
ConstructChat
Ask ConstructChat about IFB - 2026 - CP - 2606 63 Spaulding Ave Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project shall include all necessary labor , supervision , equipment , tools , and materials for the completion of roof replacement and repair work on Areas A , B & C in accordance withthe attached construction drawings . Area A will require the removal and disposal of all layers of existing modified bitumen roofing followed by the installation of a new Induction Welded TPO roof membrane over R - 30 Insulation . Areas B & C require new Induction Welded TPO roof membrane over existing EPS Insulation and replacement of base flashing . Existing ballast rock shall be reused in these areas . Work also includes removal and replacement of all metal cap flashings , modifications to drainage scuppers & modifications to the existing MEP equipment located atop Area A in accordance with the attached construction drawings and specifications . All dimensions and scope of work shall be verified by contractors prior to submission of bids . This Project will require the assistance of an licensed electrician and a licensed mechanical contractor to properly complete the roof replacement . All electrical and mechanical work ( adjustments , relocations , disconnects & reconnects ) associated with electrical conduit , boxes , gas lines and equipment work must be completed by a licensed and insured commercial electrician and / or mechanical contractor . The costfor this work must be included in the bid . Contractor to closely coordinate interruptions in power / service with PWMD Project Manager as to not negatively affect the occupants of the building . All work shall be done in a thorough workman - like manner in accordance with current Pueblo County Building Division Codes and Regulations . Area A shall consist of : 1 . All labor , equipment , supplies , materials , and all other costs related to the successful completionof the project . 2 . Remove and dispose of existing sheet metal cap flashings . 3 . Remove and dispose of all layers of existing modified bitumen roofing , exposing the structuralwood deck . Inspect existing deck for damage . Notify PWMD of any damaged deckingimmediately . Photo - document ( before & after ) and replace damaged wood decking with matchingmaterial . 4 . Contractor shall enlist the services of a licensed electrician to relocate the electrical conduitcurrently powering the RTU located on Area A . Conduit should be relocated so as not to obstructcricket valleys or water flow to drainage points . 5 . Enlarge existing NW corner drainage opening to allow for new scupper flashing sleeve per theattached construction drawings . 6 . Inspect abandoned NE collector head & downspout location . If drainage opening is present & scupper location can be used , please refer to Alternate 1 on roof plan . ( If scupper cannot beused , remove and dispose of existing collector head & downspout . Mechanically fasten new 24 - gauge sheet metal cover plate set in bed of high - grade sealant . Paint new cover plate to matchsurrounding conditions .) 7 . Install 2 layers of 20 psi Polyiso ( CGF ) insulation , mechanically fastened to the wood deck . 8 . Install ½ ” / ft . tapered sumps & 1 ” / ft . tapered crickets in accordance with the attachedconstruction drawings . 9 . Contractor shall enlist the services of licensed MEP contactor to raise rooftopequipment / ductwork as / if needed to allow for 8 ” minimum flashing height . 10 . Mechanically fasten ½ ” Polyiso HD cover board at inside face of all 4 parapet walls . HD board toextend from top of roof insulation to the top of parapet . 11 . Install 60 mil TPO roof membrane ( white ) induction welded per manufacturer requirements . 12 . Install 60 mil TPO base flashings ( white ) fully adhered per manufacturer requirements . 13 . Furnish and install new dura - block pipe supports as required to support gas line & electricalconduit . Remove and dispose of any cinderblock / improvised pipe supports . Set new pipesupports on protection layer of TPO roof membrane . 14 . Install new TPO walkway pads in areas indicated on roof plan . 15 . Install new 24 - gauge prefinished cap flashings , PWMD to choose from manufacturer ’ s standardcolors . Exterior face of new cap flashing shall be long enough to cover any existing “ paint - lines ” that may have been left during removal of old cap flashing . 16 . Remove all trash related to roof replacement daily and upon project completion . 17 . Provide a 2 - year workmanship warranty and a 20 - year NDL Manufacturer ’ s warranty coveringmaterials and labor . Areas B & C1 . All labor , equipment , supplies , materials , and all other costs related to the successful completionof the project . 2 . Remove and dispose of existing sheet metal cap flashings . 3 . Remove and reserve ballast surfacing as required to expose roof membrane . 4 . Remove and dispose of existing roof membrane , exposing the ½ ” EPS insulation board below . Notify PWMD of any broken or damaged EPS board immediately . Photo - document ( before & after ) and replace EPS board as needed . 5 . Install ½ ” / ft . tapered EPS crickets in accordance with the construction drawings . 6 . Install 60 mil TPO roof membrane ( white ) loose laid for ballasted application . 7 . Install 60 mil TPO base flashings ( white ) fully adhered per manufacturer requirements . 8 . Install protection mat over new installed roof membrane . 9 . Redistribute ballast surfacing over newly installed protection mat & roof membrane . New roofmembrane must be adequately ballasted at the end of each workday . 10 . Install new 24 - gauge prefinished cap flashings , PWMD to choose from manufacturer ’ s standardcolors . Exterior face of new cap flashing shall be long enough to cover any existing “ paint - lines ” that may have been left during removal of old cap flashing . 11 . Remove all trash related to roof replacement daily and at project completion . Provide a 2 - year workmanship warranty and a 20 - year NDL Manufacturer ’ s warranty covering materialsand labor . See more |
Location
Country | United States of America (USA) |
State | Colorado |
City | Pueblo West |
Source
Source | Pueblo West Metropolitan District - Colorado |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Power Generation (CCGT), Commercial |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
