logo

IH - 26011 / Power Plant Cooling Tower Renovation - 1341 Sherman

Bids closed Mar 2026 · Rocky Mountain E-Purchasing System · Last reported Mar 2026

Source: Rocky Mountain E-Purchasing System

Tender
Closed

Capitol Complex Facilities is seeking out a qualified vendor to provide a comprehensive refurbishment of the East cooling tower located at the Power Plant , 1341 Sherman St , Denver Colorado . This project includes all necessary equipment , materials , and labor , ensuring the system is fully operational up on co

Status
Closed
Sector
Oil and Gas, Power Generation (CCGT), Steel, Government, Water Supply and Storage, Commercial
Location
Rocky Mountain E-Purchasing System, United States of America
Updated
3 Nov 2026
Source
Rocky Mountain E-Purchasing System

ConstructChat

Ask ConstructChat about IH - 26011 / Power Plant Cooling Tower Renovation - 1341 Sherman

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “IH - 26011 / Power Plant Cooling Tower Renovation - 1341 Sherman” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Rocky Mountain E-Purchasing System, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Capitol Complex Facilities is seeking out a qualified vendor to provide a comprehensive refurbishment of the East cooling tower located at the Power Plant , 1341 Sherman St , Denver Colorado . This project includes all necessary equipment , materials , and labor , ensuring the system is fully operational up on completion . All parts and labor must include full manufacturer warranties . The cooling tower is a 2 - cell tower manufactured by Marley , model NC 5202CM - 98 , S / N 136236 . Vendor shall : Coordinate scheduling with the State Mechanical Shop Manager and schedule work for the cooling tower during the specified period . Vendor shall perform Lock - Out , Tag - Out ( LO - TO ) and follow prescribed OSHA ( Occupational Safety & Health Administration ) standards . Remove existing fill media and associated brackets and / or hangers . Remove existing hot water basin distribution panel and nozzles . Clean , prepare , and grind cold water basins , side walls and hot water basins . Apply patch steel as needed . Install cooling tower grade liner to prepped surfaces . Install new nozzles and new / refurbished distribution panels . Install new bottom supported pack fill media and supports . Service both tower fans , draining oil from gearbox and cleaning gearbox . Install new OEM pinion seals and cage caps . Add ISO ( International Standards Organization ) synthetic gear oil to manufacturer specification type and level . Realign and adjust motor , check fan blade pitch and adjust if necessary . Perform a thorough cleanup of the site , removing all leftover materials , tools , and debris .

Location

Country

United States of America (USA)

State

Rocky Mountain E-Purchasing System

Source

Source

Rocky Mountain E-Purchasing System

URL

More Details

Record type

Tender

Sector

Oil and Gas, Power Generation (CCGT), Steel, Government, Water Supply and Storage, Commercial

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender