logo

Implementation of Battery Energy Storage System at Čierny Váh

One of 10,000+ tenders Taiyo tracks in Slovakia.

Source: TED Europa

Tender
Contract Notice

The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the fol

Status
Closed
Sector
Energy Storage, Power Transmission, Hydro, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Education
Location
Slovakia
Updated
3 Nov 2026
Source
TED Europa

ConstructChat

Ask ConstructChat about Implementation of Battery Energy Storage System at Čierny Váh

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Implementation of Battery Energy Storage System at Čierny Váh” is a tender record in Taiyo, linked to the Energy Storage sector. It is issued for works, goods, or services related to Slovakia.

Participants

Not available for this record.

Status

Original status

contract notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.

Original sector

Construction work, Electrical machinery, apparatus, equipment and consumables; lighting, Electrical machinery, apparatus, equipment and consumables; lighting, Construction work, Education and training services, Architectural, construction, engineering and inspection services, Electrical machinery, apparatus, equipment and consumables; lighting, Architectural, construction, engineering and inspection services, Agricultural, farming, fishing, forestry and related products, Electrical machinery, apparatus, equipment and consumables; lighting

Location

Country

Slovakia

Source

Source

TED Europa

URL

More Details

Record type

Tender

Sector

Energy Storage, Power Transmission, Hydro, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Education

Article published date

2026-10-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender