Improvement of Structural Glass Canopy at the Connecting Bridge on the 7th Floor ASEC New Building
The scope, dates and status of this tender. A free account opens every field.
Source: DevelopmentAid
Improvement of Structural Glass Canopy at the Connecting Bridge on the 7th Floor ASEC New Building
- Status
- Closed
- Sector
- Bridge, Commercial
- Location
- Indonesia
- Updated
- 3 Nov 2026
- Source
- DevelopmentAid
ConstructChat
Ask ConstructChat about Improvement of Structural Glass Canopy at the Connecting Bridge on the 7th Floor ASEC New Building
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Improvement of Structural Glass Canopy at the Connecting Bridge on the 7th Floor ASEC New Building |
Location
Country | Indonesia |
Source
Source | DevelopmentAid |
URL |
More Details
Record type | Tender |
Sector | Bridge, Commercial |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in Indonesia
- Remote Sensing & Field Data Integration
- Penyedia Jasa Pemeliharaan Jalan Layang (Elevated) PT LRT Jakarta
- Indonesia Disaster Risk Finance & Insurance: Development of The National Financial Catastrophic Loss Model for The Inclusion Of State-Owned Bridge Assets (ABMN), Climate Change, Economic Loss Assessment, and Formulation of Bridge Insurance Policy in South Sulawesi and Nusa Tenggara - Project GRiF
- P514984- Project Preparation of Indonesia Road Connectivity Improvement Program - Procurement Plan (Directorate of Road and Bridge Management Systems and Strategy, DG Highways, MPW)
- Waterproofing Work at Connecting Bridge Fl. 2 New Building
- RFP: Preparation of Detailed Engineering Design and Construction of an Artificial Arboreal Bridge for the Tapanuli Orangutan Corridor in the Batang Toru Ecosystem
