Tender
Improvement to Roadside Drains VI – Contract B1 (Jalan Teliti, Toh Tuck Road, Jalan Senang, Pasir Panjang Hill and Enterprise Road)
Sector: Water Supply and Storage • Location: Singapore
Source: Singapore's National Water Agency
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment
- Location
- Singapore
- Updated
- 22 Jul 2026
- Source
- Singapore's National Water Agency
ConstructChat
Ask ConstructChat about Improvement to Roadside Drains VI – Contract B1 (Jalan Teliti, Toh Tuck Road, Jalan Senang, Pasir Panjang Hill and Enterprise Road)
Pick a question to edit it, or write your own.
First answer free · no account
I am a
Tender Information FAQ
Tender Information
2 Q
Participants
| Not available for this record. |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
| Not available for this record. |
Location
Country | Singapore |
Source
Source | Singapore's National Water Agency |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Singapore
- Proposed Sewers in Senoko Way and Woodlands Avenue 6 Area (Woodlands Avenue 6)
- Improvement To Roadside Drains VI – Contract B2 (Jalan Boon Lay, Jalan Jambu Ayer, Joo Seng Road And Jalan Hajijah Areas)
- Proposed Sewers in Senoko Way and Woodlands Avenue 6 Area (Senoko Way)
- Proposed Sewers in Senoko Way and Woodlands Avenue 6 Area (Woodlands Dr. 7)
- DESIGN AND CONSTRUCTION OF A 6M DIAMETER TUNNEL WITH TWIN 2200MM AND 1200MM DIAMETER WATER PIPELINES FROM PROPOSED TUAS WATER RECLAMATION PLANT TO JURONG ISLAND – CONTRACT 1
- Proposed Sewers in Loyang Way and Pasir Ris Drive 3 Areas
- Proposed 1600mm Diameter Water Pipeline along Pasir Ris Drive 3 from Elias Road to Loyang Way
- Improvement to PA Camp and Parbury Outlet Drains (From East Coast Parkway to the sea)
