IN-LINE INSPECTION FOR ENAGÁS GAS PIPELINE SYSTEM 2027-2029
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
Enagás plans to inspect between 7 to 10 gas pipelines per year, of different diameters (600-700 km/year). The technology used shall be MFL + caliper + IMU, tools must be ATEX certified. The service shall include previous runs of gauge plate pig and cleaning pig, mobilisation and demobilisation, transporting onsite, as well as the cleaning of the tools. Each ILI shall be performed in one week.
- Status
- Closed
- Sector
- Architectural, construction, engineering and inspection services
- Location
- Spain
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about IN-LINE INSPECTION FOR ENAGÁS GAS PIPELINE SYSTEM 2027-2029
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Enagás plans to inspect between 7 to 10 gas pipelines per year, of different diameters (600-700 km/year). The technology used shall be MFL + caliper + IMU, tools must be ATEX certified. The service shall include previous runs of gauge plate pig and cleaning pig, mobilisation and demobilisation, transporting onsite, as well as the cleaning of the tools. Each ILI shall be performed in one week. |
Original sector | Architectural, construction, engineering and inspection services |
Location
Country | Spain |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
