Income-qualified Customer Assistance Program Concurrent Application System (CAS) Phase 1 Implementation
Closed · California
Source: Pacific Gas and Electric Company
The IOUs (PG&E, SCG, SDG&E, and SCE) are looking to identify companies (Bidder) that can design, develop, and host an online statewide CAS web portal with on-going future maintenance with PG&E taking the lead to source for the development and Phase 1 implementation. The design of the CAS platform requires enabling income-qualified customers to concurrently apply, to multiple low-income customer as
- Status
- Closed
- Sector
- Power Generation (CCGT), Hydro, Commercial, Manufacturing (Industrial), Residential
- Location
- California, United States of America
- Updated
- 22 Jul 2026
- Source
- Pacific Gas and Electric Company
ConstructChat
Ask ConstructChat about Income-qualified Customer Assistance Program Concurrent Application System (CAS) Phase 1 Implementation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The IOUs (PG&E, SCG, SDG&E, and SCE) are looking to identify companies (Bidder) that can design, develop, and host an online statewide CAS web portal with on-going future maintenance with PG&E taking the lead to source for the development and Phase 1 implementation. The design of the CAS platform requires enabling income-qualified customers to concurrently apply, to multiple low-income customer assistance programs, starting with the California Alternate Rates for Energy (CARE), Family Electric Rate Assistance (FERA), and Energy Savings Assistance (ESA) programs and IOU selected energy saving programs. The CAS portal will complement, rather than replace, existing application processes for the selected low-income programs. The CAS platform must be scalable to include future other assistance energy saving programs that may go beyond the IOUs programs. In addition to being capable of supporting the application programming interface and batch processes to interface with existing IOU backend systems to store, track, and extract the collected inquiry and application data in a format that complies with each IOUs data requirement. |
Location
Country | United States of America (USA) |
State | California |
Source
Source reliability | High |
Source | Pacific Gas and Electric Company |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Hydro, Commercial, Manufacturing (Industrial), Residential |
Article published date | 2023-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America (USA)
- Electrical Maintenance and Non-structural Construction Services at John F. Kennedy International Airport – Four (4) Year Work Order Contract
- LGA-124.267 (RFx 7 257) - (ADV) - LaGuardia Airport - Rehabilitation of Pump House Electrical System
- Bid 6000001711 - Aeronautical Edge Lighting Equipment and Spare Parts, as Mfd. by O.C.E.M. Acquisition Corp., d/b/a Multi Electric Manufacturing, Inc. to Various Warehouses in NY and NJ - One (1) Year Requirements Contract
- GWB-244.289 (RFx 7 300) - (ADV) - George Washington Bridge - Rehabilitation of Center Avenue and Lemoine Avenue Bridges
- PAT-774.221 (RFx 7 220) - (FTA) - (ADV) - PATH - Exchange Place Pump Room and Infrastructure Replacement
- JFK-194.015 (RFx 7 275) - (ADV) - John F. Kennedy International Airport - Replacement of AOA Guard Post Barriers
- Port Newark - Port Street Corridor Improvements
- ONE (1) 2015 FOUR-DOOR 4WD LARGE UTILITY VEHICLE
