Indian Camp Creek Invasive Species Control
Closed · Missouri · Last reported Mar 2026
Source: Missouri Purchasing Group
- Acreage is approximate Indian Camp Creek Park Table 1 ( priority ) Woodland # 1 9 . 4 * Woodland # 2 13 . 4 * Woodland # 3 8 . 9 * Total acres 31 . 7 * Woodland # 1 11 . 1 * Oglesby Park Table 2 Woodland # 2 5 . 2 * Woodland # 3 18 . 3 * Total acres 34 . 6 * acreage is approximate . Specific Performance Requirements The co
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Indian Camp Creek Invasive Species Control
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | * Acreage is approximate Indian Camp Creek Park Table 1 ( priority ) Woodland # 1 9 . 4 * Woodland # 2 13 . 4 * Woodland # 3 8 . 9 * Total acres 31 . 7 * Woodland # 1 11 . 1 * Oglesby Park Table 2 Woodland # 2 5 . 2 * Woodland # 3 18 . 3 * Total acres 34 . 6 * acreage is approximate . Specific Performance Requirements The contractor shall perform cutting and treating at Indian Camp Creek Park and Oglesby Park ( time permitting ) as directed by the Parks Department within the areas indicated on the attached maps . Plant species to be targeted include the following . · Multiflora Rose · Autumn Olive · Callery pear · Bush honeysuckle (< 2ft in height ) The contractor will provide the services in accordance with the following requirements : 1 . Contractor will notify county contacts of intent to cut and treat . 2 . No work shall be done April 1st thru July 31st . 3 . Cut and treat at specific locations in the parks in the order given in the table on page one . 4 . Provide crew members to work / operate when weather conditions allow for favorable working conditions ( no chemical application will be performed within 30 minutes of forecasted rain events ). 5 . Provide chainsaws , brush cutters , and sprayers used to cut and spray . 6 . Herbicide will be provided by the contractor . a . All chemicals used must have an active ingredient of 41 % glyphosate . b . The mixing of the chemical with at least 41 % glyphosate must be at a rate of 50 % water and 50 % chemical . c . If below 32 degrees RV antifreeze will be used in the mixture as well . d . All herbicide application methods including solution ingredients and measurements must be consistent with the label . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
