Indoor Air Quality 5 - Year Report
Sector: Forest Products and Packaging • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
Step 1 - Ventilation Verification Assessment Phase A uniform inspection and evaluation of the heating , ventilation , and air conditioning system within the school . It should be noted that support from additional vendors ( Control Vendor or Maintenance Vendor ) may be required to perform the assessment . To include :
- Status
- Closed
- Sector
- Forest Products and Packaging, Commercial
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Indoor Air Quality 5 - Year Report
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Step 1 - Ventilation Verification Assessment Phase A uniform inspection and evaluation of the heating , ventilation , and air conditioning system within the school . It should be noted that support from additional vendors ( Control Vendor or Maintenance Vendor ) may be required to perform the assessment . To include : • Testing for maximum filtration efficiency . • Physical measurements of outside air delivery rate . Verification of the appropriate condition and operation of ventilation components . • Measurement of air distribution through all system inlets and outlets . • Verification of unit operation and that required maintenance have been performed in accordance with the most recent ASHRAE indoor ventilation standards . Step 2 - Reporting Phase The report must include any corrective actions necessary to be performed to the mechanical ventilation system or the heating , ventilation , and air conditioning infrastructure to achieve compliance with current ventilation standards . • A review of the data collected in the ventilation verification report and determination to what extent the systems are providing appropriate ventilation to the building . • Recommendation for installation of filters meeting the most optimal level of filtration . • Recommendation for the installation of carbon dioxide sensors ( if applicable ). • Recommendation for any additional maintenance or repairs required . • Recommendation for any additional upgrades or equipment replacement . Testing - Scope of work : IAQ testing • Test for maximum filtration efficiency • Measurement of outdoor air rates • Verification of condition and operation of ventilation components • Measurement of all air distribution systems . ( Certified Balancer ) • Verification of unit operation . • Verification of control sequences . • Verification of CO2 sensors . • Collection of data if no ventilation systems exist . Testing - Scope of work : IAQ testing Provide written report including air balancing reports ( signed by third party engineer ) and recommendation for repairs for non - compliant systems and complete the State of CT online 5 - Year Reporting Form . Firms shall provide photographic documentation of the areas reviewed and tested as part of the final report . 1 ) Provide a draft copy for review and comment by the ELPS Facilities Department prior to final submission . 2 ) Provide final report on two paper copies and electronically for the ability to upload and post online . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Forest Products and Packaging, Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Forest Products and Packaging tenders in United States of America
- Norfolk Zoo Trail of the Tiger Boardwalk Repairs
- Marin Street Sewer Replacement - BID TABULATION
- Panhandle and Inner Sunset Large Sewer Rehabilitation [BID T...
- Various Locations Sewer Replacement No. 8 [BID TABULATION]
- Southeast Water Pollution Control Plant Biosolids Digester F...
- Master As-Needed Tree Services - Hetch Hetchy [EVALUATION CO...
- Channel Force Main Intertie [Bid Tabulation]
- Mountain Tunnel Improvements Project [BID TABULATION]
