Industry Day_Noaa/Uscg Recapitalization Project (Design-Build)
Sector: Waste Processing and Treatment • Location: Juneau, Alaska, United States of America
Source: SAM.gov
Purpose: The National Oceanic and Atmospheric Administration (NOAA), in support of the United States Coast Guard (USCG), invites interested industry partners to attend an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event is intended to: Provide a high-level overview of the project scope and objectives Highlight key technical challenges and execution
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Power Generation (CCGT), Aerospace & Defense, Wind, Government, Seaport, Commercial, Residential, Warehouse, Water Supply and Storage, Power Transmission
- Location
- Juneau, Alaska, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Industry Day_Noaa/Uscg Recapitalization Project (Design-Build)
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | special notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Purpose: The National Oceanic and Atmospheric Administration (NOAA), in support of the United States Coast Guard (USCG), invites interested industry partners to attend an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event is intended to: Provide a high-level overview of the project scope and objectives Highlight key technical challenges and execution considerations Offer industry insight into site conditions and operational constraints Support market awareness in advance of the formal solicitation Provide a site walk for potential design/build contractors Project Overview: The Government is planning a Design-Build (DB) project to recapitalize and modernize the waterfront infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. The project will deliver a resilient, mission-ready waterfront facility capable of supporting Coast Guard operations in the Arctic and Alaska region, including search and rescue, maritime security, environmental response, and national defense missions. The anticipated construction magnitude is approximately $125M–$200M, with contract award currently projected for FY26 (Q4). Scope Overview (High-Level): The project generally includes the Design-Build recapitalization of the existing waterfront and supporting infrastructure, including: Demolition of aging waterfront wharf and support facilities (not existing shoreside buildings) Construction of a new wharf to support at least (1) cutter berth Construction of a new floating pier system supporting multiple (2) cutter berths Fender systems and mooring infrastructure for USCG and visiting vessels Shore power and electrical system upgrades Potable water, sewer, fire protection, and communications systems Backup power and site-wide utility distribution Civil/site improvements Optional work may include the following: MWD building renovations Covered floating small boat facility Additional building renovations Dredging Note: This overview is provided for general awareness only. Detailed requirements will be included in the forthcoming Request for Proposals (RFP). Key Technical Considerations: This project presents significant technical and logistical challenges, including: Extreme tidal variation (>25 feet) 100 MPH localized Taku wind events High seismic design requirements Cold-region construction and corrosion exposure Heavy cutter berthing and mooring loads The project site is an active, 24/7 operational Coast Guard installation and there will be a requirement to maintain continuous USCG operations during construction Temporary utilities, access, and mooring systems will be required Marine logistics, seasonal work windows, and environmental permitting will be critical Cold-region or Arctic construction Site Walk: A site walk of USCG Station Juneau waterfront facilities will be conducted as part of Industry Day. The site walk will include the following: Provide firsthand understanding of existing conditions Support industry planning for constructability and execution RSVP: The Industry Date is set to occur on Wednesday, June 3, 2026. All interested parties shall complete the Google Form as provided in the link below by May 27, 2026. An email with event details will be provided separately. Please direct all questions regarding Industry Day to jana.kolb@noaa.gov and amy.l.mcliverty@noaa.gov. https://docs.google.com/forms/d/e/1FAIpQLScpDa_ISY3rBIW91gt4Y-k6OSfc-fQafCgD8ur1GDaPtFWbAw/viewform Disclaimer: This Industry Day is for informational purposes only and does not constitute a solicitation. The Government is not obligated to issue a solicitation or award a contract as a result of this notice. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Alaska |
City | Juneau |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Power Generation (CCGT), Aerospace & Defense, Wind, Government, Seaport, Commercial, Residential, Warehouse, Water Supply and Storage, Power Transmission |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
