Inground Lift Supply & Installation
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
DESCRIPTION OF WORK Supply and installation of inground lift system for ½ ton pickup to 33 ton plow trucks Lift Capacity : minimum 75 , 000 lbs Yes : No : Cylinder size & capacity Front , single , 10 ” ( min .), 25 , 000 lbs Yes : No : Front Cylinder Hydraulically Adjusted Yes : No : With traditional cover plates Rea
- Status
- Closed
- Sector
- Airport, Steel, Cement, Power Transmission, Power Generation (CCGT), Road
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Inground Lift Supply & Installation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK Supply and installation of inground lift system for ½ ton pickup to 33 ton plow trucks Lift Capacity : minimum 75 , 000 lbs Yes : No : Cylinder size & capacity Front , single , 10 ” ( min .), 25 , 000 lbs Yes : No : Front Cylinder Hydraulically Adjusted Yes : No : With traditional cover plates Rear , dual 10 ” ( min .) 50 , 000 lbs Yes : No : Wheel Base : Minimum : 78 ” to 240 ” Yes : No : Voltage : 208V , 3 Phase Yes : No : Controls : Pedestal Mounted Control Yes : No : Adapters : 360 ° Adapters and Extensions Yes : No : Installation : • Saw cut , removal and disposal of existing concrete and other materials . • Removal of the existing lift system , leave all removed components at the ECRC facility . • Excavate , form & place new concrete and backfill for concrete floor . • All concrete work : o 4000 psi ( min .) structural grade concrete and be reinforced . o All exposed concrete surfaces shall have curing compound placed . o New to existing concrete shall have # 6 rebar dowls 12 ” on center and adhered into existing concrete slab . o Concrete slab finish shall be a toweled finish . • Install utility chases as needed . • Installation of inground lift per manufacturer guidelines . • Set frame , install final components , test and make final adjustments . • Training of employees shall be given after all testing is completed . • If the situation arises , all repairs to existing utilities ( airline , electrical , plumbing , etc .) shall be approved prior to and after repair for workmanship . • 1 year minimum warranty of all workmanship and materials . • All materials and density will be tested by ECRC , paid for by ECRC • Provide ECRC a digital or hard copy of all operation , service and parts manuals |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Airport, Steel, Cement, Power Transmission, Power Generation (CCGT), Road |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
