Inslope Flattening , RCBC Extension , Pipe
Location: South Dakota, United States of America
Source: South Dakota Purchasing Group
The Contractor will perform all construction staking . The Contractor may elect to use grading equipment with an automated machine control system for Machine Control Grading ( MCG ) provided the equipment and methods used provide the same results in the finished work as conventional construction staking . The Eng
- Status
- Closed
- Location
- South Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- South Dakota Purchasing Group
ConstructChat
Ask ConstructChat about Inslope Flattening , RCBC Extension , Pipe
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor will perform all construction staking . The Contractor may elect to use grading equipment with an automated machine control system for Machine Control Grading ( MCG ) provided the equipment and methods used provide the same results in the finished work as conventional construction staking . The Engineer may require the Contractor to revert to conventional staking methods for all or part of the work at any point during construction if , in the Engineer ’ s own opinion , the MCG produces unacceptable results . The Department will not allow the Contractor to use MCG as a substitute for conventional construction staking for slope staking and slope stake referencing , paving hub staking , structure staking , miscellaneous staking , or final cross section surveying . The staking work includes , but is not limited to , establishing or re - establishing the project centerline ; establishing control points and benchmarks as needed ; setting additional benchmarks as needed ; perform measurement and volume calculations of all Contractor secured borrow sources , State designated borrow sources , and topsoil stockpiles ; and staking right - of - way , easements , and fence . The Contractor will perform measurement and volume computations by the average end area method at the slope stake stations and plus stations , surface - to - surface method , or alternate measurement and computation method approved by the Engineer . |
Location
Country | United States of America (USA) |
State | South Dakota |
Source
Source | South Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
