logo

Inspection , Testing & Repair for Phoenix Control Valves

Closed · Arizona · Last reported Dec 2025

Source: Arizona Purchasing Group

Tender
Closed

Please note : This is a Sole Source Notification . 1 . Contractor Requirements 1 . 1 . Contractor shall be certified by Phoenix Controls in : 1 . 1 . 1 . Phoenix Controls ’ Sales and Applications . 1 . 1 . 2 . Start - up , testing , and troubleshooting for all Phoenix Controls ’ products . 2 . Contractor Responsibilities 2 . 1 . The

Status
Closed
Sector
Advanced Electronics, Power Generation (CCGT), Commercial
Location
Arizona, United States of America
Updated
3 Nov 2026
Source
Arizona Purchasing Group

ConstructChat

Ask ConstructChat about Inspection , Testing & Repair for Phoenix Control Valves

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Inspection , Testing & Repair for Phoenix Control Valves” is a tender record in Taiyo, linked to the Advanced Electronics sector. It is issued for works, goods, or services related to Arizona, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Please note : This is a Sole Source Notification . 1 . Contractor Requirements 1 . 1 . Contractor shall be certified by Phoenix Controls in : 1 . 1 . 1 . Phoenix Controls ’ Sales and Applications . 1 . 1 . 2 . Start - up , testing , and troubleshooting for all Phoenix Controls ’ products . 2 . Contractor Responsibilities 2 . 1 . The Contractor shall provide technicians with intimate knowledge and expertise in Phoenix Control valves ventilation system to evaluate the performance of the ASPHL ventilation system and generate a monthly inspection report . The testing and inspection services include , but are not limited to the following : 2 . 1 . 1 . Verify that each fume hood is being controlled at the design flow volume and adjust as required . 2 . 1 . 2 . Check each sash sensor physical condition and operation and adjust as required . 2 . 1 . 3 . Verify the proper operation of each fume hood monitor and adjust as required . 2 . 1 . 4 . Verify the proper operation of each fume hood exhaust valve and adjust as required . 2 . 1 . 5 . Verify the proper operation of tracking supply air valves and adjust as required . 2 . 1 . 6 . Check wire connections and terminations at the fume hood . 2 . 1 . 7 . Check AC and DC voltage level and power supply conditions . 2 . 1 . 8 . Verify operation of Phoenix Controls server and add new system updates , including software if available . 2 . 1 . 9 . Check static pressure upstream and static pressure drop across fume hood exhaust , general exhaust and supply air valves . 2 . 1 . 10 . Verify that each fume hood ’ s average face velocity is a minimum of 100 feet per minute ( FPM ) or as directed by ADHS and adjust average face velocity as required . 2 . 1 . 11 . Verify system mechanisms maintain appropriate negative room pressurization and adjust as required . 2 . 1 . 12 . Ensure all devices are online and communication are working between the building automation system ( BAS ).

Location

Country

United States of America (USA)

State

Arizona

Source

Source

Arizona Purchasing Group

URL

More Details

Record type

Tender

Sector

Advanced Electronics, Power Generation (CCGT), Commercial

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender