Integrated Contact Centre - Technical Infrastructure Migration - Design and Build
Sector: Commercial • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The Trust is embarking on a programme as part of its ICC strategy, which will result in the ICC having one of the largest Control Rooms within in the Ambulance Service sector in the country, in terms of available operator positions. The scale and complexity of this delivery should not be underestimated. It is crucial to understand that a control room is not the same as an office fit-out; although
- Status
- Prospective
- Sector
- Commercial, Residential
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Integrated Contact Centre - Technical Infrastructure Migration - Design and Build
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Trust is embarking on a programme as part of its ICC strategy, which will result in the ICC having one of the largest Control Rooms within in the Ambulance Service sector in the country, in terms of available operator positions. The scale and complexity of this delivery should not be underestimated. It is crucial to understand that a control room is not the same as an office fit-out; although there can be some overlap, an office fit-out is a broader term covering the process of designing and refurbishing an entire office space to meet specific business needs, whereas a control room is a specialised, dedicated area within a facility designed for managing critical operations. It involves complex technology integration and requires a full-scale, resilient model for critical infrastructure and systems. The design and functionality of a control room are specific and require specialised expertise, with distinct priorities and design considerations. Complex control room systems, infrastructure and construction demand specialist expertise to ensure functionality, security, and resilience is delivered, is a key requirement for this project. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Commercial, Residential |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United Kingdom
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- NCH - Mental Health Unit Furniture Tender
- ID 6246207 - SEUPB - Information Services - Data Protection Officer Advisory Services
- Aquisição de Serviços para ações de promoção e divulgação das DOP Porto e Douro no mercado do Reino Unido
- SUMIT Project - Provision of Digital Products
