Invitation to supplier seminar New Security Post Valen Helse Fonna HF
Prior information notice · Norway · Last reported Dec 2025
Source: TED Europa
The need for security psychiatry in the health company/development perspectiveOverordna plan for Security Psychiatry in Norway points to an increase in the number of sentenced to forced mental health care also on timed judgements. More new judgements will be handed down than the number of sentences ceased. There is therefore an increased need for security places at both local and regional levels i
- Status
- Prospective
- Sector
- Commercial
- Location
- Norway
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Invitation to supplier seminar New Security Post Valen Helse Fonna HF
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | prior information notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The need for security psychiatry in the health company/development perspectiveOverordna plan for Security Psychiatry in Norway points to an increase in the number of sentenced to forced mental health care also on timed judgements. More new judgements will be handed down than the number of sentences ceased. There is therefore an increased need for security places at both local and regional levels in the work with security psychiatry in Norway.The current Security Post is characterised by inappropriate systems connected to area, security measures, buildings and outside areas. It is for small premises to necessary functions so that concurrency conflicts occur. There is a lack of patient baths and too few and different screening rooms set up against the need. Access and reception rooms are inappropriate, and there is a lack and inadequate screened outside area on the same level. In the current area, the zone division does not exist. There is an increasing need to be able to divide into zones with, among other things, being able to divide into periods when women also have in the department or have patients with different screening needs connected to noise and impressions. New areas will facilitate buildings, areas and technology that can contribute to increased quality, patient safety and safety for both employees and patients. |
Original sector | Construction work, Construction work, Construction work, Construction work, Construction work, Construction work |
Location
Country | Norway |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Commercial |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in Norway
- Expert Support to Facilitate the Community of Practice of Cities in the Republic of Norway
- Non-Tactical Vehicle Rentals
- Routine Elevator Maintenance For U.S. Embassy Oslo Building
- Design-Bid-Build (Dbb) Construction Of A Base Perimeter Security Fence, Rygge Air Station, Norway
- The purchase of waste collection materials.
- Framework agreement for planning and engineering design services for Rogaland county 2026-2030
- 2025/5559 - Operation and maintenance of lift facilities in Trøndelag.
- Tradesman services painting and covering the University Hospital North Norway HF Tromsø.
