Ionad Oideachas agus Oige Údarás na Gaeltachta
Source: Office of Government Procurement, Ireland
- Foirgnimh na gcoláistí samhraidh (968 m²), spásanna clúdaithe amuigh faoin aer (122 m²), foirgneamh forthí (170 m²) agus droichead coisithe reatha (9 m²) atá ann faoi láthair a leagan. 2. Coimeádán lasta a choinneáil le haghaidh stórála (15 m²). 3. Foirgneamh ilfheidhmeach nua a thógáil lena n-áirítear seomraí ranga, halla tionóil agus seomra léachta (2543 m²), foirgneamh forthí ceardlainne nua
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. Foirgnimh na gcoláistí samhraidh (968 m²), spásanna clúdaithe amuigh faoin aer (122 m²), foirgneamh forthí (170 m²) agus droichead coisithe reatha (9 m²) atá ann faoi láthair a leagan. 2. Coimeádán lasta a choinneáil le haghaidh stórála (15 m²). 3. Foirgneamh ilfheidhmeach nua a thógáil lena n-áirítear seomraí ranga, halla tionóil agus seomra léachta (2543 m²), foirgneamh forthí ceardlainne nua (199 m²), droichead coisithe nua trasna na hAbhann Ruibhe (26 m²), carrchlós nua ar leibhéal na sráide agus pointe seachadta bus nua (1527 m²), oibreacha athlonnaithe agus uasghrádaithe acomhail ar rochtain Thearmann Ainnín agus oibreacha athlonnaithe trasrian coisithe (Bóthar: R336) agus acomhal iontrála nua carrchlóis ó Bhóthar L52030 agus na seirbhísí cruadhreachtaithe, tírdhreachtaithe agus seirbhísí gaolmhara os cionn talún agus faoi thalamh atá ag teastáil. Demolition of the existing summer college buildings (968 m²), covered outdoor spaces (122 m²), existing workshop building (170 m²), and existing pedestrian bridge (9 m²). Retention of a shipping container for storage purposes (15 m²). Construction of a new multi-functional building including classrooms, an assembly hall and a lecture room (2,543 m²); a new workshop building (199 m²); a new pedestrian bridge across the River Ruibhe (26 m²); a new street-level car park and new bus drop-off point (1,527 m²); relocation and upgrading works to the junction at the access to Tearmann Ainnín and relocation works to a pedestrian crossing (Road: R336); a new car park entrance junction from Road L52030; and all associated hard landscaping, landscaping, and above-ground and underground services required. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
