logo

Isles of Scilly Renewable Energy Capacity Study

Sector: Water Supply and Storage • Location: United Kingdom

Source: Find a Tender Service (UK)

Tender
Active

The National Planning Policy Framework (December 2024) requires the planning system to support the transition to net zero and take full account of all climate impacts, including overheating, water scarcity, storm risk and coastal change. It also requires authorities determining applications for renewable energy proposals to give significant weight to the benefits of renewable and low carbon energy

Status
Bidding
Sector
Water Supply and Storage
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about Isles of Scilly Renewable Energy Capacity Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Isles of Scilly Renewable Energy Capacity Study” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The National Planning Policy Framework (December 2024) requires the planning system to support the transition to net zero and take full account of all climate impacts, including overheating, water scarcity, storm risk and coastal change. It also requires authorities determining applications for renewable energy proposals to give significant weight to the benefits of renewable and low carbon energy generation, and to consider identifying suitable areas for renewable and low carbon energy in Local Plans. The December 2025 consultation draft NPPF reinforces the expectation that Local Plans must be underpinned by proportionate, place specific evidence relating to energy, climate resilience and net zero transition. Given these requirements and the islands' constrained grid, nationally protected landscape, heritage sensitivities and unique exposure to climate impacts, a Renewable Energy Capacity Study is essential to inform sound, defensible Local Plan policy. This Renewable Energy Capacity Study is a critical component of the Local Plan evidence base. It will ensure that spatial policies and development management decisions actively support genuinely sustainable development, embedding renewable and low carbon energy generation, energy efficiency and climate resilience into the location, design and delivery of new development. The study will provide the Council with a proportionate, place specific understanding of where and how renewable energy can be delivered in a constrained island context, and how renewable energy considerations should shape housing, employment and infrastructure growth rather than sit alongside it.

Budget

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender