ITB 26-105 Lake Hearn Drive Sidepath Construction Project
Sector: Bridge • Location: Georgia, United States
The Lake Hearn Drive Sidepath Project will remove approximately 450 linear feet the existing sidewalk along the north side of Lake Hearn Drive from Perimeter Center Parkway to the first driveway to the west and replace it with an ~8 foot wide multiuse sidepath. Work includes demolition, removal, hauling, and disposal of the existing concrete sidewalk, coordination with Georgia Power to move decora
- Status
- Closed
- Sector
- Bridge, Aerospace & Defense, Mass Transit, Hospital, Stadium, Hydro, Warehouse, Cable car, Power Transmission, Tunnel, Raw Materials, Rail, Road, Car parking, Oil and Gas, Manufacturing (Industrial), Automotive, Residential, Airport, Waste Processing and Treatment, Cement, Power Generation (CCGT)
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about ITB 26-105 Lake Hearn Drive Sidepath Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Lake Hearn Drive Sidepath Project will remove approximately 450 linear feet the existing sidewalk along the north side of Lake Hearn Drive from Perimeter Center Parkway to the first driveway to the west and replace it with an ~8 foot wide multiuse sidepath. Work includes demolition, removal, hauling, and disposal of the existing concrete sidewalk, coordination with Georgia Power to move decorative pedestrian street lights from the back side of the existing sidewalk to the beauty strip behind the back of existing concrete curb, grading, compaction, forming, and pouring a new concrete multiuse sidepath. Following installation of the sidepath, the Contractor will restore and install new sod. Minor repairs to existing curb, gutter, and concrete ADA compliant handicap ramps may be required. The Owner has previously signed and pre-paid for Georgia Power to relocate the street lights, and the expected installation time is approximately 2 weeks. The streetlights will be relocated immediately following removal of the existing sidewalk. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Bridge, Aerospace & Defense, Mass Transit, Hospital, Stadium, Hydro, Warehouse, Cable car, Power Transmission, Tunnel, Raw Materials, Rail, Road, Car parking, Oil and Gas, Manufacturing (Industrial), Automotive, Residential, Airport, Waste Processing and Treatment, Cement, Power Generation (CCGT) |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- FY26-CP-E15 Professional Services for Construction Engineering & Inspection
- 26-272 Deans Bridge Road MSW Landfill Phase III, Stage II South Cell 2 - Phase 1
- Road Widener
- New Front Mounted Broom
- T32-D1-Bridge-SR 347 Hall-186668
- T32-D6-Bridge-A1Cherokee SR417 Ex20-186812
