ITEM: Camp Orchard Solar Array Design
Sector: Commercial • Location: Boise, Idaho, United States of America
Source: Dodge USA
Idaho National Guard will design bid documents for a ground mounted photovoltaic system. Design of this system will be for approximately $1.8MM of construction. Solar panels constructed during this project will be tied to the existing MATES electrical distribution switchgear.
- Status
- Closed
- Sector
- Commercial, Solar, Power Generation (CCGT)
- Location
- Boise, Idaho, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ITEM: Camp Orchard Solar Array Design
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | Request for Qualifications |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Idaho National Guard will design bid documents for a ground mounted photovoltaic system. Design of this system will be for approximately $1.8MM of construction. Solar panels constructed during this project will be tied to the existing MATES electrical distribution switchgear. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Idaho |
City | Boise |
Source
Source | Dodge USA |
URL |
More Details
Record type | Tender |
Sector | Commercial, Solar, Power Generation (CCGT) |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
