ITS - Mar - 2026 - Data - Cabling - RFP
Sector: Broadband • Location: Georgia, United States of America
Source: Georgia Purchasing Group
Scope of Project Standards and Description The Barrow County School System is interested in the following : 0 . Adding one CAT - 6A data drop terminated in biscuit jack located above ceiling in blue highlighted locations on prints and as specified in the attached cable location spreadsheet . Cabling is to be
- Status
- Closed
- Sector
- Broadband, Telecommunications
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about ITS - Mar - 2026 - Data - Cabling - RFP
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope of Project Standards and Description The Barrow County School System is interested in the following : 0 . Adding one CAT - 6A data drop terminated in biscuit jack located above ceiling in blue highlighted locations on prints and as specified in the attached cable location spreadsheet . Cabling is to be used to connect Wireless Access Points . Adding CAT - 6 data drops , terminated in existing gang boxes , for data connections in orange highlighted locations on prints and as specified in the attached cable location spreadsheet . Adding one CAT - 6 data drop terminated in biscuit jack located above ceiling in green highlighted locations on prints and as specified in the attached cable location spreadsheet . Cabling is to be used to connect security cameras . Adding two ( 2 ) CAT - 6 data drops terminated in biscuit jacks , located above the ceiling in the purplehighlighted locations on the prints and as specified in the attached cable location spreadsheet . One ( 1 ) CAT - 6 drop will be designated for the Audio Enhancement camera , and one ( 1 ) CAT - 6 drop will be designated for the Audio Enhancement system amplifier connection . Sufficient slack shall be provided on the Audio Enhancement system drop to allow the amplifier cabling to be pulled to either side of the room as required . The camera cabling shall be left with slack positioned at the center of the room for proper camera placement . The horizontal cabling system is based on the installation of 4 - pair unshielded twisted pair ( UTP ) category 6 data cables , conforming to applicable ANSI / EIA / TIA / BICSI standards . Specifications for the Fiber Optic Backbone , Jacks and Outlets , Horizontal Wiring , and Patch Panels are provided in this document . The intent of this document is to establish the specifications and standards of the project . Specific products and model numbers are mentioned for the purpose of conveying design expectations . Comparable or equivalent equipment will be considered . Vendor is expected to provide new data racks / cabinets for cabling . Vendor will use cable tray to support new cabling . Existing penetrations into classrooms may be used by vendor if dedicated solely to data cabling and available . Vendor is expected to provide additional patch panels as required , penetrations into classrooms if required , and J - hooks if / as required in classrooms . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Broadband, Telecommunications |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
