logo

Ivinson Infrastructure Upgrades - Phase 2 Project

Sector: Waste Processing and Treatment • Location: Rocky Mountain E-Purchasing System, United States of America

Source: Rocky Mountain E-Purchasing System

Tender
Closed

Removal of all existing sanitary sewer lines within Ivinson Ave . and replacement of approx . 560 LF of 21 - inch and 1 , 800 LF of 18 - inch PVC ; removal and replacement of existing water and sanitary sewer lines within the alley between 13th and 14th Streets with 8 - inch PVC ; rehabilitation of the exi

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Road
Location
Rocky Mountain E-Purchasing System, United States of America
Updated
3 Nov 2026
Source
Rocky Mountain E-Purchasing System

ConstructChat

Ask ConstructChat about Ivinson Infrastructure Upgrades - Phase 2 Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Ivinson Infrastructure Upgrades - Phase 2 Project” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Rocky Mountain E-Purchasing System, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Removal of all existing sanitary sewer lines within Ivinson Ave . and replacement of approx . 560 LF of 21 - inch and 1 , 800 LF of 18 - inch PVC ; removal and replacement of existing water and sanitary sewer lines within the alley between 13th and 14th Streets with 8 - inch PVC ; rehabilitation of the existing storm sewer via CIPP and replacement of storm inlets . Utility work includes installation of approx . 3 , 100 LF of 8 - inch AWWA C900 PVC waterline and appurtenances . Street work includes a full - width removal and replacement of the existing surfacing sections along the entire project lengths of Ivinson Ave ., 13th St ., and the 13th – 14th St . Alley . Surfacing rehabilitation of 12th and 14th Streets includes utility patching , select taper milling , and full width asphalt overlay with select removal and replacement of existing concrete curb and gutter . Miscellaneous concrete flatwork will be required for existing sidewalks , alley approaches , etc . associated with curb and gutter replacement and the removal and installation of Americans with Disabilities Act ( ADA ) ramps throughout the project limits . Street work also includes removal and replacement of the existing 9th St . intersection traffic signal system , signing , and striping . Construction includes removal and replacement of manholes , waterline valves and fire hydrant assemblies , connections to existing water and sanitary sewer systems , service line replacement , landscaping restoration and all incidental work as shown on the Plans .

Location

Country

United States of America (USA)

State

Rocky Mountain E-Purchasing System

Source

Source

Rocky Mountain E-Purchasing System

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Water Supply and Storage, Cement, Power Transmission, Power Generation (CCGT), Road

Article published date

2026-05-06

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender