J041 -- RFQ Amendment ( Questions ) 13 MAR 26 Repair Services - Chiller Plant Skid 1 & 2 Pump
Closed · Mississippi · Last reported Mar 2026
Source: Mississippi Purchasing Group
Amendment 00001 provides responses to questions for Solicitation Number 36C25626Q0449 and extends the due date of this solicitation . 1 . Photos of the pumps / motors showing piping arrangement , electrical connection , and nameplate data . Are VFDs required ? Is there any BAS connections or interlocks for the pumping
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Residential
- Location
- Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- Mississippi Purchasing Group
ConstructChat
Ask ConstructChat about J041 -- RFQ Amendment ( Questions ) 13 MAR 26 Repair Services - Chiller Plant Skid 1 & 2 Pump
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment 00001 provides responses to questions for Solicitation Number 36C25626Q0449 and extends the due date of this solicitation . 1 . Photos of the pumps / motors showing piping arrangement , electrical connection , and nameplate data . Are VFDs required ? Is there any BAS connections or interlocks for the pumping system ? ANS : The pics are attached to the email for this project . VFD ' s are required but not being replaced . No BAS connections needed . 2 . Electrical for the Motors : HP , Voltage , Amperage and disconnecting means and locations . ANS : The information are located in the pics attached to the email . Electrical is all on name plate of pumps in pics 3 . Pump capacity information : Flow Rate in GPM , & Pumping Head . ANS : The information are located in the pics attached to the email . Flow rate and GPM are on name plates in pics 4 . What type of insulation is installed and thickness ? ANS : The insulation is wrapped fiberglass insulation 2 " thick 5 . Is pump an End Suction , Double Suction , or In Line type Pump . ANS : See pics of pumps for the alignment for inlet and outlet 6 . What is the pipe size for the Taco Triple Duty Valves to be installed . ANS : The piping is 12 " for chiller 1 and 10 " for chiller 2 Clarify the questions come from the scope : " The Contractor shall provide all tools , shipping , delivery , personnel , transportation , demolition , removal of old equipment , installation of new equipment , modifications to existing piping , to deliver and install the necessary equipment for repairing Chillers 1 , and 2 ANS : The contractor must install both pump / motor for each chiller 1 & 2 and triple duty valve for both chillers . 2 . The scope is to provide regular system health checks , preventative / routine maintenance , repairs , onsite training , and access to a technical support team in support of two industrial chillers and their subcomponents which consist of , but not limited to : magnetic drive pumps , piping , electrical connections , regulator valves , pneumatic actuators , gauges and indicators , heat exchangers , AC drives , and input modules . " ANS : The contractor after installation must verify the installation correct with functional for the 2 chillers pump / motors and triple duty valve . |
Location
Country | United States of America (USA) |
State | Mississippi |
Source
Source | Mississippi Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
