James J . Eagan HVAC Replacement
Closed · Missouri · Last reported Mar 2026
Source: Missouri Purchasing Group
ontractor shall furnish and install one ( 1 ) air - cooled scroll chiller meeting or exceeding the following specifications : Manufacturer : Carrier ( or approved equal ). Model : 30RCM1526S055 - 7 - 2 . Type : Air - Cooled Scroll Chiller . Cooling Capacity : ~ 142 . 6 Tons . Refrigerant : R - 32 . Dual Refrigerant Circuits . Brazed Plate
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Commercial
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about James J . Eagan HVAC Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | ontractor shall furnish and install one ( 1 ) air - cooled scroll chiller meeting or exceeding the following specifications : Manufacturer : Carrier ( or approved equal ). Model : 30RCM1526S055 - 7 - 2 . Type : Air - Cooled Scroll Chiller . Cooling Capacity : ~ 142 . 6 Tons . Refrigerant : R - 32 . Dual Refrigerant Circuits . Brazed Plate Heat Exchanger ( BPHE ). Microchannel Condenser Coil . Variable Condenser Fans ( High - Efficiency ). BACnet IP & MS / TP Compatibility . 7 ” Control Display with Quick Restart / Capacity Recovery . Low Sound Package with Aero - Acoustic Fans . Single Point Power . Evaporator Heater ( Freeze Protection ). All equipment shall be new , factory - authorized , and AHRI - certified . Scope of Work - The contractor shall provide turnkey installation including , but not limited to : 1 . Demolition & Removal Drain , disconnect , and remove existing chiller . Recover refrigerant and dispose of equipment per EPA regulations . 2 . Rigging & Placement Provide crane and rigging services . Set and secure new chiller on existing pad / structure . 3 . Mechanical Installation Modify and reconnect piping as required . Reconnect to existing building systems . Reuse existing shutoff valves where feasible . Insulate piping and components as needed . 4 . Electrical & Controls Reconnect existing electrical service . Re - land existing control wiring . 5 . System Start - Up Fill system , test for leaks , and purge air . Provide factory startup and commissioning . Verify full operational performance . 5 . Contractor Responsibilities Field verify all dimensions and utilities . Coordinate work with City staff . Maintain site safety and protection . Provide cleanup and debris disposal . Obtain permits if required . Comply with all applicable codes . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Sole Source for a Hand Held Video Receiver System
- Security Hardware Services
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- PreQualification of Bidders for Chaboya Improvements
- Alonzo Babe James Community Center Playground Artificial Turf
- Prefabricated Manufactured Structures as Living Quarters for County Fire Personnel
