January 2026 vehicle bid
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
Item # 01 - 2026 Crew cab and chassis with 12 ' van body ; Item # 02 - 2026 hybrid compact crew cab pickup with 4 ' bed ; Item # 03 - 2026 hybrid compact crew cab pickup with 4 ' bed ; Item # 04 - 2026 Chevrolet Work Truck Silverado ev Pickup ; Item # 05 - 2026 Ford eTransit van with long wheelbase and low
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Education, Automotive
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about January 2026 vehicle bid
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Item # 01 - 2026 Crew cab and chassis with 12 ' van body ; Item # 02 - 2026 hybrid compact crew cab pickup with 4 ' bed ; Item # 03 - 2026 hybrid compact crew cab pickup with 4 ' bed ; Item # 04 - 2026 Chevrolet Work Truck Silverado ev Pickup ; Item # 05 - 2026 Ford eTransit van with long wheelbase and low roof ; Item # 06 - 2026 Ford eTransit van with long wheelbase and low roof ; Item # 07 - 2026 Ford eTransit van with long wheelbase and high roof |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Electric Vehicles (EVs), Education, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Electric Vehicles (EVs) tenders in United States of America
- St Marks Headway Greenway Phase II
- Town Wide Energy Resilience Master Plan
- Electrical and Lighting Products EV Charging Stations and Services
- Autel MaxiSys Ultra EV Automotive Scanner
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Annual Substation Herbicide Treatment
- Electric Vehicle Charging Stations Replacement Expansion and Management
- Electric Vehicle EV Charging Stations Maintenance and Networking Services
