logo

Juneau - Douglas High School Boiler Replacement

Closed · Alaska · Last reported Dec 2025

Source: Alaska Purchasing Group

Tender
Closed

The Work for this project generally includes but is not limited to • Replace existing oil - fired boilers and burners with new . Work shall include the connection to existing breeching , hydronic piping , and fuel piping with modifications provided as needed for connections to new equipment . • Install boiler and

Status
Closed
Sector
Manufacturing (Industrial), Oil and Gas, Commercial
Location
Alaska, United States of America
Updated
3 Nov 2026
Source
Alaska Purchasing Group

ConstructChat

Ask ConstructChat about Juneau - Douglas High School Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Juneau - Douglas High School Boiler Replacement” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Alaska, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Work for this project generally includes but is not limited to • Replace existing oil - fired boilers and burners with new . Work shall include the connection to existing breeching , hydronic piping , and fuel piping with modifications provided as needed for connections to new equipment . • Install boiler and burner controls and related trim as required and as indicated in the manufacturer ’ s burner installation and operation manual for a complete and operational system . • Provide all electrical work necessary for the replacement of the burners and boiler controls . Utilize project specific Powerflame shop drawings and wiring diagrams for field low voltage and line voltage installation requirements . All work necessary for a fully operational burner / boiler system included hereunder . • Contractor shall provide factory trained and certified burner technician to conduct the start - up , testing , and commissioning of the burners including tuning of the modulation controls and verification of proper boiler and burner operation . field reports required . • Provide testing and balancing of boiler flow equipment

Location

Country

United States of America (USA)

State

Alaska

Source

Source

Alaska Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial), Oil and Gas, Commercial

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender