JUSTICE CENTER INMATE FLUSH CONTROLS - TRANSPORTATION AND PUBLIC WORKS - IFB # 2025 - 12 - 2233 - MH
Sector: Water Supply and Storage • Location: Missouri, United States of America
Source: Missouri Purchasing Group
Project Overview This Project requires the provision and installation of an electronic water management system for all occupant - accessible fixtures located in Pod D on the eighth floor of the Justice Center , including both the main floor and the mezzanine level . The system shall incorporate individual cell
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about JUSTICE CENTER INMATE FLUSH CONTROLS - TRANSPORTATION AND PUBLIC WORKS - IFB # 2025 - 12 - 2233 - MH
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Overview This Project requires the provision and installation of an electronic water management system for all occupant - accessible fixtures located in Pod D on the eighth floor of the Justice Center , including both the main floor and the mezzanine level . The system shall incorporate individual cell valve controllers within the plumbing chases to operate electronic - hydraulic water closet flush valves , electronic lavatory valves , and electronic shower valves . The Contractor shall furnish all labor , materials , equipment , and incidentals necessary to complete the Project . At a minimum , this includes all work shown and identified in the drawings attached with the bid . All technical specifications associated with this Project are included within this document . The work shall encompass all required devices , valves , piping , wiring , controls , and the operator workstation necessary to provide a complete , functional , and fully operational water management system in accordance with the plans . The Contractor shall coordinate all work with the Department of Public Works . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
