Kemin-Balykchy Interconnection Project: Project Implementation Support And FIDIC Supervision Engineer
Sector: Power Transmission • Location: Kyrgyzstan
Source: DevelopmentAid
Kemin-Balykchy Interconnection Project: Project Implementation Support And FIDIC Supervision Engineer
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Kyrgyzstan
- Updated
- 3 Nov 2026
- Source
- DevelopmentAid
ConstructChat
Ask ConstructChat about Kemin-Balykchy Interconnection Project: Project Implementation Support And FIDIC Supervision Engineer
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Kemin-Balykchy Interconnection Project: Project Implementation Support And FIDIC Supervision Engineer |
Location
Country | Kyrgyzstan |
Source
Source | DevelopmentAid |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2026-03-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in Kyrgyzstan
- Bazar-Korgon Water Sub-project: BKWP - 4 - Construction Of The Utility Office Building
- Lot 1: Construction of 220/110/10 kV Karakol Substation and Extension of 220/110/24 kV Tamga Substation Lot 2: Construction of 220 kV Tamga–Karakol Transmission Line and Associated 110 kV Lines
- Electricity Supply Digitalization Project: Equipment And Materials For Rehabilitation Of Low Voltage Distribution Networks
- UNDP-KGZ-00817 Procurement of Vehicles
- Electricity Supply Digitalization Project: Smart Meters & Software And Hardware & Materials For Installation Of Smart Meters
- Procurement of Vehicles
- Modernization of Dolinka Substation and Upgrade of Rechnaya Substation: Project Implementation Support, Including Construction Supervision
- Kemin-Balykchy Interconnection Project: Construction of the 500 kV Kemin-Balykchy transmission line (53 km) and 500 kV substation in the town of Balykchy, north-eastern of Kyrgyz Republic.
