KESWICK PARK MASTER PLAN IMPLEMENTATION
Sector: Water Supply and Storage • Location: Georgia, United States of America
Source: Georgia Purchasing Group
Scope of Work The intent of this scope of work is to provide all professional services normally anticipated for design , permitting , and construction phase services for a project of this type . Offerors may add to , or alter , the following scope of work , as they see fit to accomplish the work . Specific
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Power Generation (CCGT), Car parking, Automotive
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about KESWICK PARK MASTER PLAN IMPLEMENTATION
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope of Work The intent of this scope of work is to provide all professional services normally anticipated for design , permitting , and construction phase services for a project of this type . Offerors may add to , or alter , the following scope of work , as they see fit to accomplish the work . Specifically , the selected offeror will provide professional engineering services for the design of Keswick Park – Upper Area based upon the following assumptions : ( 1 ) Design based on the boundary , topography and underground utility survey , provided by the city . ( 2 ) Design documents based on the approved conceptual master plan , see Appendix B , and the outcome of two ( 2 ) additional public input meetings conducted by the selected firm for this project . ( 3 ) Permitting will be required with DeKalb County . ( 4 ) Geotechnical services , if required , will be provided by the City . ( 5 ) Offeror will provide project management , civil engineering , landscape architecture and structural design for the project . ( 6 ) Offeror will procure sub - consultants for the project . ( 7 ) Photometric studies will be needed for the field , parking lot and pathway lighting . ( 8 ) Stormwater management design shall achieve both water quality / runoff reduction and channel protection . Infiltration - based , vegetative green infrastructure practices should be contemplated in addition to underground detention . ( 9 ) Land disturbance will be greater than 1 acre , therefore 3 - phase erosion control plans and submittal of an NOI will be required . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Power Generation (CCGT), Car parking, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
