The Killingly Brick Yard Project consists of : Demolition of pavements and curbing ; installing sediment controls ; limited parking area re - grading , concrete sidewalks and dumpster pad with fencing : precast concrete curbing : ADA compliant curb ramps ; stone dust surfacing ; traffic signage ; color patterned pavement coat
- Status
- Closed
- Sector
- Metal, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Cement, Automotive, Road
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Killingly Brickyard
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Killingly Brick Yard Project consists of : Demolition of pavements and curbing ; installing sediment controls ; limited parking area re - grading , concrete sidewalks and dumpster pad with fencing : precast concrete curbing : ADA compliant curb ramps ; stone dust surfacing ; traffic signage ; color patterned pavement coatings ; brick masonry ; site lighting ; electrical service ; underground conduits and sleeves ; fixed metal bollards ; granite block bollards ; flagstone walkway ; bike racks ; trash receptacle ; plantings ; and ancillary items as shown and described in the Contract Documents . F . Add Alternates No 1 : Install Art Park Plantings ; approved topsoil , amendments and mulch are included in the base bid . No 2 : Install floral MMA pavement markings No 3 : Install brick MMA pavement markings No 4 : Install gear MMA pavement markings Work Under Separate Contracts : G . 1 . 2 . Milling and Paving of Parking Lot a . The Killingly Brickyard Site Contractor will be responsible for coordinating with the milling and paving contractor 1 ) Milling and paving work includes milling of the parking lot to a 3 inch depth and repaving the entire parking lot with 3 inches of new asphalt . The Brickyard Site Contractor will be responsible for all work required to remove existing asphalt , modify the subbase materials as required , and binder course to within 3 inches of the proposed finish grades specified in the contract documents and within the project limits . Public Art Installations a . The Killingly Brickyard Site Contractor will be responsible for coordinating with the Public Art Contractor 1 ) The Public Art Contractor is responsible for design , engineering , fabrication and installation of 3 art pieces with varying responsibilities by the Brickyard Site Contractor . a ) Two pylons to be installed at the Main Street parking lot entry shall include design , engineering ( foundations & pylons ), fabrication and installation of the foundations and pylons by the Public Art Contractor , b ) excavation , site preparation , and power for / to the foundation will be performed by the Brickyard Site Contractor . The Public Art Contractor will be responsible for extending conduits through the foundation , providing lighting and making electrical terminations internal to the pylons . One sculpture to be installed at Killingly Brickyard Plaza shall include design , engineering ( foundations & sculpture ), fabrication and installation of the sculpture by the Public Art Contractor . Excavation , site preparation , installation of the brick veneered foundation & sculpture anchors , and power to the sculpture base will be performed by the Brickyard Site Contractor . The Public Art Contractor will be responsible for providing lighting , conduits above grade and making electrical terminations internal to the sculpture . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Power Generation (CCGT), Manufacturing (Industrial), Car parking, Cement, Automotive, Road |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender