Kinetic Park Splash Pad Maintenance
Sector: Water Supply and Storage • Location: Missouri, United States of America
Source: Missouri Purchasing Group
1 . Chemical Monitoring and Management a . Routine testing twice daily and remotely monitored , and balancing of water chemistry , including : i . Free chlorine : Maintain 1 . 0 – 5 . 0 ppm for splash pads ( per § 233 . 160 ). ii . pH : Maintain between 7 . 2 – 7 . 8 . iii . Total alkalinity : Maintain 80 – 120 ppm depending on
- Status
- Closed
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Kinetic Park Splash Pad Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Chemical Monitoring and Management a . Routine testing twice daily and remotely monitored , and balancing of water chemistry , including : i . Free chlorine : Maintain 1 . 0 – 5 . 0 ppm for splash pads ( per § 233 . 160 ). ii . pH : Maintain between 7 . 2 – 7 . 8 . iii . Total alkalinity : Maintain 80 – 120 ppm depending on the sanitizer and PH balance used . b . Daily testing logs must be maintained for 24 months and made available upon request . ( Copy should be retained electronically for quick response request .) (§ 233 . 190 ). c . Daily , Weekly and Monthly equipment usage reports indicating flow rates , PH , ORP / PPM readings charted , with operational recommendations . d . Include recommendations for chemical usage and frequency . 2 . Pump and System Maintenance a . Seasonal Start - Up : i . Large debris should be removed . The body of water should be cleaned and prepped for filling . ii . Remove the winterization plugs iii . Check the hydrostatic valves and replace as needed iv . Reinstall any return fittings and grates . v . Ensure the strainers are assembled and plugged . vi . Perform inspection of all exposed plumbing . vii . Reassemble any filtration equipment . viii . Reinstall any features that were removed . ix . Reinstall any plugs removed from equipment and features during winterization . x . Re - assemble the BECS units . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
