logo

Kings Bridge Deck Replacement ( OFFICE FILE 1863 . 0 )

Sector: Road • Location: Montana, United States of America

Source: Montana Purchasing Group

Tender
Closed

2 . 1 Demolition and Removal The Contractor shall : 1 . Remove existing timber decking planks along the full bridge length . 2 . Remove and dispose of existing edge boards / curbs ( rim boards ) on both sides of the deck . 3 . Remove and dispose of all existing curb fasteners (“ side pins ”) located along deck ed

Status
Closed
Sector
Road, Forest Products and Packaging, Bridge, Steel, Commercial, Residential
Location
Montana, United States of America
Updated
3 Nov 2026
Source
Montana Purchasing Group

ConstructChat

Ask ConstructChat about Kings Bridge Deck Replacement ( OFFICE FILE 1863 . 0 )

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Kings Bridge Deck Replacement ( OFFICE FILE 1863 . 0 )” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Montana, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

2 . 1 Demolition and Removal The Contractor shall : 1 . Remove existing timber decking planks along the full bridge length . 2 . Remove and dispose of existing edge boards / curbs ( rim boards ) on both sides of the deck . 3 . Remove and dispose of all existing curb fasteners (“ side pins ”) located along deck edges . • Approximately 124 pins present on the narrower section • Existing pins are approximately 1 ” diameter with an estimated length of 16 ” 4 . Carefully remove existing railing systems for later reinstallation . • If necessary , the railing along the narrower section may be cut into large sections to facilitate decking removal and replacement . • Upon completion of decking installation cut sections shall be properly sleeved and welded to restore structural continuity 5 . Dispose of all demolition waste in accordance with local regulations . 2 . 2 Additional Site Work ( As Required ) Cut - back or removal of asphalt at either end of the bridge may be necessary to ensure a smooth transition between bridge and trail . This work is not included in the Contractor ’ s base bid and shall only be performed upon written authorization by the City of Great Falls . 3 . MATERIALS 3 . 1 Deck Planks • Pressure - treated structural lumber , # 2 Southern Yellow Pine or approved equivalent . • Minimum preservative treatment : AWPA UC4B ( exterior structural , ground - contact ). • Thickness requirements o Approximately 7 ” thickness for narrower section o Approximately 12 ” thickness on wider section • Moisture content at installation : 19 % or less . • Lumber shall be free of excessive warping , splitting , or defects that would impair performance or pedestrian safety . 3 . 2 Edge Boards / Rim Boards Edge boards or curbs shall be replaced in - kind , consistent with existing bridge construction . • Timber bridge span : Replace existing timber curb / rim boards with new pressure - treated lumber of similar size , orientation , and configuration . • Steel bridge span : Existing edge boards appear to be installed flatwise and notched around steel girders . Replacement shall match existing size , orientation , notching , and attachment method unless otherwise directed by the City .

Location

Country

United States of America (USA)

State

Montana

Source

Source

Montana Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Forest Products and Packaging, Bridge, Steel, Commercial, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender