Kingsway Tunnel - Asbestos Insulating Board (AIB) 'Dado' Panels Removal
Sector: Tunnel • Location: United Kingdom
Source: Find a Tender Service (UK)
Merseytravel is inviting tenders from suitably qualified and experienced licenced asbestos removal contractors (LARCs) for the removal and disposal of AIB backed 'dado' cladding panels to the length of the Kingsway Tunnel North and South tubes. This will include the removal and disposal of associated bracketry/ support fixings and the redundant cabling fixed behind dado panels and subsequent decon
- Status
- Bidding
- Sector
- Tunnel, Telecommunications
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Kingsway Tunnel - Asbestos Insulating Board (AIB) 'Dado' Panels Removal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Merseytravel is inviting tenders from suitably qualified and experienced licenced asbestos removal contractors (LARCs) for the removal and disposal of AIB backed 'dado' cladding panels to the length of the Kingsway Tunnel North and South tubes. This will include the removal and disposal of associated bracketry/ support fixings and the redundant cabling fixed behind dado panels and subsequent decontamination and cleaning of the structure. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Tunnel, Telecommunications |
Article published date | 2026-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Tunnel tenders in United Kingdom
- A38 Saltash Tunnel Management System (TCMS)
- Pest Control - House Crickets
- KW and QW Tunnel Emergency Ventilation Control Services
- RCC Post 2027 - Dartford & Hindhead HATMS Tunnel Systems
- Diversionary Works – Eastern Portal Saltash Tunnel - National Grid
- TRU W2BC Tunnel / Slab Track Tender - ES5-8
- London Wall Car Park Phase 2 – Pipe Subway Tunnel & Waterproofing Works
- KINGSWAY TUNNEL REFURBISHMENT (DADO PANELS)
