LAKE SHAMROCK DAM DAM REHABILITATION
Sector: Hydro • Location: MITN, United States of America
Source: MITN Purchasing Group
Construct new primary spillway structure , remove existing spillway , construct auxiliary spillway at location of existing spillway , regrade downstream channel , install SCADA system . Major work items include : install sheetpile cofferdam , construct concrete gated spillway structure , dredging and channel grading , dam demolit
- Status
- Closed
- Sector
- Hydro, Bridge, Cement
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about LAKE SHAMROCK DAM DAM REHABILITATION
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Construct new primary spillway structure , remove existing spillway , construct auxiliary spillway at location of existing spillway , regrade downstream channel , install SCADA system . Major work items include : install sheetpile cofferdam , construct concrete gated spillway structure , dredging and channel grading , dam demolition , construct auxiliary spillway , install premanufactured pedestrian bridge , install SCADA instrumentation system , and site restoration . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Bridge, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
