Lake Tobesofkee Dam Automated Gate System
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
Site Inventory and identify scope of dam rehabilitation 1 . Site investigations , including survey , subsurface utility investigations , geotechnical investigations , environmental engineering , to verify existing conditions if necessary . 2 . Preliminary evaluation of proposed dam rehabilitation issues related to materials needed
- Status
- Closed
- Sector
- Hydro, Power Generation (CCGT), Power Transmission
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Lake Tobesofkee Dam Automated Gate System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Site Inventory and identify scope of dam rehabilitation 1 . Site investigations , including survey , subsurface utility investigations , geotechnical investigations , environmental engineering , to verify existing conditions if necessary . 2 . Preliminary evaluation of proposed dam rehabilitation issues related to materials needed for the project , equipment needed and provide proposed project timeline , constructability , time , labor and scheduling factors related to project cost . Draft and complete engineering design and plans for the dam lift gate system 1 . Prepare any necessary design plans for Macon Bibb County Staff consideration . 2 . Plans will include : Diagram or written description of all components needed for the system . A diagram or description of all electrical and mechanical requirements . Specifics to address the dam gate lift requirements . The components for the dam lift gate system must perform the following functions . • The ability for remote operation and remote monitoring . • Must automatically maintain a normal pool elevation of 360 feet . • Must be capable of providing notifications of activities ( Gate Opening and Closing , Power outages , etc .) • Alerts for all Malfunctions • Must provide a log of all dam activity . • Have the ability for monthly exercise of the emergency generator • Provide an alarm to notify downstream fishermen prior to the gate opening with sufficient time to clear . • Replace the existing lift motors with new lift motors for the Dam gate lift system . • Bidder must provide training on the new system and a written Standard Operation Procedure 3 . Work in digital format : AutoCAD ; PDF copies shall also be provided . 4 . Develop Design - Builder ’ s Proposal detailing a written scope of the work required to complete the work including all lift gate system functions , contract sum , proposed date of substantial completion and list of key Design - Build personnel and suppliers . Design Development 1 . Based on the approved Design plans , satisfactorily resolve all review comments from federal , state , and local permitting agencies . 2 . Documents produced in digital format : AutoCAD software . PDF copies shall also be provided . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Hydro, Power Generation (CCGT), Power Transmission |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Hydro tenders in United States of America
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Bay Corridor Transmission & Distribution - Phase 2 (2019) S...
- College Hill Reservoir Outlet Structure And Pipeline
- Bay Corridor Transmission and Distribution - Phase 3 (2019)
- Regional Groundwater Storage and Recovery
- Fillmore and Haight Street Intersection AWSS, Pavement, and ...
- REJECTED: Southeast Water Pollution Control Plant Power Feed...
- Turner Dam Spillway and Pond F3 East Erosion Repair
