logo

Lake Tobesofkee Dam Automated Gate System

The scope, dates and status of this tender. A free account opens every field.

Source: Georgia Purchasing Group

Tender
Closed

Site Inventory and identify scope of dam rehabilitation 1 . Site investigations , including survey , subsurface utility investigations , geotechnical investigations , environmental engineering , to verify existing conditions if necessary . 2 . Preliminary evaluation of proposed dam rehabilitation issues related to materials needed

Status
Closed
Sector
Hydro, Power Generation (CCGT), Power Transmission
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Lake Tobesofkee Dam Automated Gate System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Lake Tobesofkee Dam Automated Gate System” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Site Inventory and identify scope of dam rehabilitation 1 . Site investigations , including survey , subsurface utility investigations , geotechnical investigations , environmental engineering , to verify existing conditions if necessary . 2 . Preliminary evaluation of proposed dam rehabilitation issues related to materials needed for the project , equipment needed and provide proposed project timeline , constructability , time , labor and scheduling factors related to project cost . Draft and complete engineering design and plans for the dam lift gate system 1 . Prepare any necessary design plans for Macon Bibb County Staff consideration . 2 . Plans will include : Diagram or written description of all components needed for the system . A diagram or description of all electrical and mechanical requirements . Specifics to address the dam gate lift requirements . The components for the dam lift gate system must perform the following functions . • The ability for remote operation and remote monitoring . • Must automatically maintain a normal pool elevation of 360 feet . • Must be capable of providing notifications of activities ( Gate Opening and Closing , Power outages , etc .) • Alerts for all Malfunctions • Must provide a log of all dam activity . • Have the ability for monthly exercise of the emergency generator • Provide an alarm to notify downstream fishermen prior to the gate opening with sufficient time to clear . • Replace the existing lift motors with new lift motors for the Dam gate lift system . • Bidder must provide training on the new system and a written Standard Operation Procedure 3 . Work in digital format : AutoCAD ; PDF copies shall also be provided . 4 . Develop Design - Builder ’ s Proposal detailing a written scope of the work required to complete the work including all lift gate system functions , contract sum , proposed date of substantial completion and list of key Design - Build personnel and suppliers . Design Development 1 . Based on the approved Design plans , satisfactorily resolve all review comments from federal , state , and local permitting agencies . 2 . Documents produced in digital format : AutoCAD software . PDF copies shall also be provided .

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Hydro, Power Generation (CCGT), Power Transmission

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender