Land and Soil Preparation
Sector: Water Supply and Storage • Location: Kansas, United States of America
Source: Kansas Purchasing Group
PROJECT ITEM 1 – Site Preparation and Clearing – Clearing , grubbing , as well as trash , tire and garbage removal , shall be in accordance with Earthwork section . Brush and tree disposal shall be coordinated with the SMU in the field . Any fence components , garbage , trash , and other deleterious materials shall
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Kansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Kansas Purchasing Group
ConstructChat
Ask ConstructChat about Land and Soil Preparation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | PROJECT ITEM 1 – Site Preparation and Clearing – Clearing , grubbing , as well as trash , tire and garbage removal , shall be in accordance with Earthwork section . Brush and tree disposal shall be coordinated with the SMU in the field . Any fence components , garbage , trash , and other deleterious materials shall be collected and hauled to an approved KDHE disposal facility , except were landowners wish to salvage materials . Additional clearing may be required at the direction of the SMU to create disposal areas for the excess cut material on this project . This work will be paid for under the lump sum bid submitted by contractor . PROJECT ITEM 2 – Earthwork – This work shall be done in accordance with the applicable provisions of Earthwork section . Note , the excess cut material on this project shall be placed in valleys between spoil ridges as directed by the SMU , unless otherwise specified . This work will be paid for under the lump sum bid submitted by contractor and shall be inclusive of all the tasks listed below . 1 . Placement of Soil Fill Material The earthwork activities will be constructed to the lines and grades indicated on the drawings . The placement of fill material shall be done in accordance with the drawings and shall promote drainage . Wetland mitigation will be constructed as indicated on the drawings and will be constructed in a way that allows water to be retained within the designed mitigation area . This work will be paid for under the lump sum bid submitted by contractor . 2 . 24 ” Rip Rap The earthwork activities will be constructed at the locations indicated on the drawings . materials and installation shall be in accordance with the provisions of section 4 . 12 . This work will be paid for under the lump sum bid submitted by contractor . 3 . AB - 3 The earthwork activities will be constructed at the locations indicated on the drawings . materials and installation shall be in accordance with the provisions of section 4 . 12 . This work will be paid for under the lump sum bid submitted by contractor . 4 . 18 ” Rip Rap Materials and installation shall be in accordance with the provisions of section 4 . 12 . Rip rap shall be placed as shown on the plans and details . This work will be paid for under the lump sum bid submitted by contractor . |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Kansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
