logo

Land and Soil Preparation

Sector: Water Supply and Storage • Location: Kansas, United States of America

Source: Kansas Purchasing Group

Tender
Closed

PROJECT ITEM 1 – Site Preparation and Clearing – Clearing , grubbing , as well as trash , tire and garbage removal , shall be in accordance with Earthwork section . Brush and tree disposal shall be coordinated with the SMU in the field . Any fence components , garbage , trash , and other deleterious materials shall

Status
Closed
Sector
Water Supply and Storage
Location
Kansas, United States of America
Updated
3 Nov 2026
Source
Kansas Purchasing Group

ConstructChat

Ask ConstructChat about Land and Soil Preparation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Land and Soil Preparation” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Kansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PROJECT ITEM 1 – Site Preparation and Clearing – Clearing , grubbing , as well as trash , tire and garbage removal , shall be in accordance with Earthwork section . Brush and tree disposal shall be coordinated with the SMU in the field . Any fence components , garbage , trash , and other deleterious materials shall be collected and hauled to an approved KDHE disposal facility , except were landowners wish to salvage materials . Additional clearing may be required at the direction of the SMU to create disposal areas for the excess cut material on this project . This work will be paid for under the lump sum bid submitted by contractor . PROJECT ITEM 2 – Earthwork – This work shall be done in accordance with the applicable provisions of Earthwork section . Note , the excess cut material on this project shall be placed in valleys between spoil ridges as directed by the SMU , unless otherwise specified . This work will be paid for under the lump sum bid submitted by contractor and shall be inclusive of all the tasks listed below . 1 . Placement of Soil Fill Material The earthwork activities will be constructed to the lines and grades indicated on the drawings . The placement of fill material shall be done in accordance with the drawings and shall promote drainage . Wetland mitigation will be constructed as indicated on the drawings and will be constructed in a way that allows water to be retained within the designed mitigation area . This work will be paid for under the lump sum bid submitted by contractor . 2 . 24 ” Rip Rap The earthwork activities will be constructed at the locations indicated on the drawings . materials and installation shall be in accordance with the provisions of section 4 . 12 . This work will be paid for under the lump sum bid submitted by contractor . 3 . AB - 3 The earthwork activities will be constructed at the locations indicated on the drawings . materials and installation shall be in accordance with the provisions of section 4 . 12 . This work will be paid for under the lump sum bid submitted by contractor . 4 . 18 ” Rip Rap Materials and installation shall be in accordance with the provisions of section 4 . 12 . Rip rap shall be placed as shown on the plans and details . This work will be paid for under the lump sum bid submitted by contractor .

Location

Country

United States of America (USA)

State

Kansas

Source

Source

Kansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender