Large Scale Non-Battery based Electrical Energy Storage Systems
Sector: Geothermal • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that
- Status
- Prospective
- Sector
- Geothermal, Energy Storage, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Large Scale Non-Battery based Electrical Energy Storage Systems
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification. STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants. These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging. For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters. Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant. The CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection. The scope of the CESS cannot be fully defined due to knowledge gaps in CESS behaviour and limitations. Once these are understood, a technology will be selected, and limitations will be incorporated into the electrical infrastructure design. This PME is looking to address the knowledge gaps. The proposed technical and operations of the CESS are •2 operational cycles per day •Pulse length will be over 1 hour (continuous) •Power range larger than 300MW •Energy capacity 100-300MWh •Response in the millisecond range •Similar charge and discharge rates. •Fast response time during power swings (full charge to discharge) •High round trip efficiency: 80% In conjunction the CESS will be required to be operated and maintained for the 20-year life of the STEP machine. Due to the requirements, we are attempting to ascertain if this could be accomplished or partly accomplished by a non-battery-based system (Flywheel, Super-conducting magnetic storage (SMES), Capacitor, Super Capacitor, Fuel Cells or other) For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Culham:-Engineering-design-services./W8UFJUNW28 To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/W8UFJUNW28 |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Energy Storage, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Geothermal tenders in United Kingdom
- STF JULES Code Migration
- ENQ1316 - Highways Flame Resistant PPE
- Double Glazing Units Demist Repair Services
- MEP Tender Notice
- Supply of Validated Laboratory Labels and Thermal Transfer Ribbons For The AWMGS
- Cavity Wall Insulation Surveys
- Provision of Receipting and Treatment of WUDS/POPS Waste Material
- Repair, Maintenance and Servicing of Bin Chute Cut Offs and Refuse Hoppers
