Lbnf Liquid Argon Lar Circulation Equipment
Sector: LNG • Location: Lead, South Dakota, United States of America
Source: SAM.gov
A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring
- Status
- Closed
- Sector
- LNG, Residential, Manufacturing (Industrial), Commercial
- Location
- Lead, South Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Lbnf Liquid Argon Lar Circulation Equipment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A brief summary of the scope is provided below. For complete details please download the Statement of Work attached to this notice. The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low-pressure suction side of the main LAr Circulation Pump (not part of this scope). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump (not part of this scope) through the system resistance (friction and internal losses in valves, piping, etc.) to the LAr Purification system. The selected vendor will engineer and manufacture the vacuum jacketed pump valve box (part of the scope) that will house the pump, the MLI insulated upstream and downstream piping, isolation valves, and instrumentation required for this operation laid out above. The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms, ladders, support beams and railings (all part of this scope). Scope Overview of the Supply Structure The LAr Circulation System VD and HD acquisition is broken down into the equipment, valves and instrumentation that are detailed in the SOW • Vacuum Jacketed Pump Valve Box • MLI insulated upstream and downstream piping of the main LAr Circulation Pumps (Pumps are not part of Supply) • Instrumentation • Isolation Valves • Pressure Safety Valves • Cryogenic Equipment Protection (Platforms, Ladders and Supports |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Lead |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | LNG, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2026-01-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More LNG tenders in United States of America
- SWPCP Cryogenic Oxygen Plant Demolition & Liquid Oxygen Syst...
- Sunol Valley Water Treatment Plant Ozonation
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Technology Licensing Opportunity: Greenfuran Direct Allylation
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Portable Special-Purpose High-Purity Nitrogen Generation Systems
- J065--Medical Gas And Vacuum System Maintenance And Inspections
