LBNF Liquid Argon LAr Circulation Equipment
Sector: LNG • Location: South Dakota, United States of America
Source: South Dakota Purchasing Group
A brief summary of the scope is provided below . For complete details please download the Statement of Work attached to this notice . The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low - pressure suction side
- Status
- Closed
- Sector
- LNG, Manufacturing (Industrial)
- Location
- South Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- South Dakota Purchasing Group
ConstructChat
Ask ConstructChat about LBNF Liquid Argon LAr Circulation Equipment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A brief summary of the scope is provided below . For complete details please download the Statement of Work attached to this notice . The LAr Circulation System VD and HD Equipment is responsible for transferring liquid argon coming from the Cryostat VD and Cryostat HD to the low - pressure suction side of the main LAr Circulation Pump ( not part of this scope ). It is also responsible for transferring liquid argon downstream of the main LAr Circulation Pump ( not part of this scope ) through the system resistance ( friction and internal losses in valves , piping , etc .) to the LAr Purification system . The selected vendor will engineer and manufacture the vacuum jacketed pump valve box ( part of the scope ) that will house the pump , the MLI insulated upstream and downstream piping , isolation valves , and instrumentation required for this operation laid out above . The cryogenic equipment in the Detector Caverns will need to be properly protected and accessible with the use of platforms , ladders , support beams and railings ( all part of this scope ). Scope Overview of the Supply StructureThe LAr Circulation System VD and HD acquisition is broken down into the equipment , valves and instrumentation that are detailed in the SOW • Vacuum Jacketed Pump Valve Box • MLI insulated upstream and downstream piping of the main LAr Circulation Pumps ( Pumps are not part of Supply )• Instrumentation • Isolation Valves • Pressure Safety Valves • Cryogenic Equipment Protection ( Platforms , Ladders and Supports |
Location
Country | United States of America (USA) |
State | South Dakota |
Source
Source | South Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | LNG, Manufacturing (Industrial) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More LNG tenders in United States of America
- SWPCP Cryogenic Oxygen Plant Demolition & Liquid Oxygen Syst...
- Sunol Valley Water Treatment Plant Ozonation
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Technology Licensing Opportunity: Greenfuran Direct Allylation
- Equipment: 7T Mri System With A Dedicated, High-Performance, Local Gradient Subsystem.
- Portable Special-Purpose High-Purity Nitrogen Generation Systems
- J065--Medical Gas And Vacuum System Maintenance And Inspections
