Legacy Concrete Roads Reconstruction Framework
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: • design and subsequent construction services for:
- demolition of existing concrete pavements,
- reconstruction of pavements (including new pavement furniture and mark
- Status
- Closed
- Sector
- Cement, Road, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Legacy Concrete Roads Reconstruction Framework
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | National Highways have awarded a national framework, the Legacy Concrete Roads Reconstruction (LCRR) framework, that allows the delivery of concrete roads reconstruction schemes. The framework scope for the LCRR framework includes: • design and subsequent construction services for: - demolition of existing concrete pavements, - reconstruction of pavements (including new pavement furniture and markings) • design and delivery of associated temporary traffic management solutions, • when instructed: - involvement in optioneering, - design and construction of alterations to those legacy assets which interface with the replacement pavements’ designs, which may include sub-surface drainage, street furniture and its foundations and signage, - design and construction to replace legacy central reserve with a hardened solution and overlay legacy concrete pavement with a long-life pavement solution (including new pavement furniture and markings), • performing principal designer and principal contractor duties as defined under the “Construction (Design and Management) Regulations 2015” (“CDM Regulations 2015”) • carbon capture recording and reporting, • recovery, recycling and reuse of arisings during the delivery of a scheme, • engagement with all identified stakeholders, and • identification, recording and realisation of programme efficiencies. The LCRR framework is six years in duration to ensure alignment to and coverage of the RIS3 funding period (2026-31) but also to overlap with the beginning of RIS4 (2031-36) in case of any delays in approvals of the strategy or funding for RIS4. This alignment of duration with our funding periods is required from a procurement, commercial and operational perspective because it provides greater efficiency and certainty that the strategic plan for which funding is received can be delivered consistently; clarity for future procurements and sufficient time to embed learning, best practice and investment in innovations. From a National Highways perspective, the proposed framework term allows for the RIS4 settlement to be finalised and agreed prior to the LCRR frameworks successor being procured. This will bring certainty of work and value to the future procurement. Works will be allocated as per the Framework Information document. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Cement, Road, Commercial |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United Kingdom
- Provision and installation of burial vaults
- Remedial Repair Works to Eastern Boundary Wall at St Mary's Closed Churchyard, Henley
- Mansion House major refurbishment - Main Contractor
- Austwick to Clapham Public Bridleway Improvement Project
- Replacement floors and associated works at 21 and 23 Lonsdale Ave, WSM (717-AHL)
- Tender for Supply and Construction of Steel Building
- PME for Live Fire Training Facility
- Installation of CVIM Generator Back Up Power