logo

Level 2 Frp Over Lab Ceilings Installation- Cofc0401

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and tr

Status
Closed
Sector
Government, Commercial, Residential
Location
Fort Collins, Colorado, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Level 2 Frp Over Lab Ceilings Installation- Cofc0401

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Level 2 Frp Over Lab Ceilings Installation- Cofc0401” is a tender record in Taiyo, linked to the Government sector. It is issued for works, goods, or services related to Fort Collins, Colorado, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government. Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects.

Original sector

Construction

Location

Country

United States of America (USA)

State

Colorado

City

Fort Collins

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Government, Commercial, Residential

Article published date

2026-03-26

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender