Level 2 Frp Over Lab Ceilings Installation- Cofc0401
One of 10,000+ tenders Taiyo tracks in Colorado.
Source: SAM.gov
Amendment 0002 (See Attached): Extends the date for the submission of proposals to Monday, 11 May 2026. Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF). SOLICITATION DETAILS The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish g
- Status
- Prospective
- Sector
- Government, Commercial, Residential
- Location
- Fort Collins, Colorado, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Level 2 Frp Over Lab Ceilings Installation- Cofc0401
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment 0002 (See Attached): Extends the date for the submission of proposals to Monday, 11 May 2026. Amendment 0001 (See Attached): A site visit is scheduled for April 13, 2026, at 0930 (MT). See attached amendment for instructions and the required Visitor Request Form (VRF). SOLICITATION DETAILS The Centers for Disease Control and Prevention (CDC) requires a contractor to repair and refinish gypsum board ceilings and walls in laboratory, laboratory support, corridors, and ancillary spaces on the second floor of Building 401 at the CDC Ft. Collins campus. The primary work includes covering designated gypsum board ceilings with smooth, white fiberglass reinforced polymer (FRP) panels and trim, installed to match existing installations in the building. The contractor will be responsible for all materials, equipment, labor, and supervision necessary to complete the work, including demolition of delaminated ceiling portions, surface preparation, installation of FRP panels and trim, sealing, and coordination with CDC for phased access to work areas. The project also requires compliance with all applicable health, safety, and environmental regulations, provision of temporary barriers and dust control, protection and temporary modification of fire protection systems, and coordination of work to minimize disruption to ongoing CDC operations. All work must be performed in accordance with the contract documents, drawings, and specifications provided by the Government. Period of Performance: Completion is required within 180 days after Notice to Proceed. Minimum Vendor Qualifications: Offerors must demonstrate at least three years of experience with similar construction and interior finish projects. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Colorado |
City | Fort Collins |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Government, Commercial, Residential |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Government tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Fuel Tank Inspection and Repair Services
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- Dual Trash and Recycling Receptacles
- Annual Inspection Testing of Aerial Devices and Digger Derricks
- 23B48LS Transit Bus Engines
- Heavy Duty Trucks and Equipment Parts and Accessories
- Automotive and Light Truck Parts and Accessories
