Lewes Wintebourne
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Open Contracting Data Standard (OCDS)
The objectives of the Project are to: 25/26 (a) Deliver capital projects which include erosion control to banks to reduce run off and sediment load into the channel (b) Deliver additional bank erosion control work (putting matting on eroding banks by the allotments), marginal planting along the stream, tree thinning along Winterbourne Lane and additional habitat work (c) Deliver wetland features
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Lewes Wintebourne
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Project are to: 25/26 (a) Deliver capital projects which include erosion control to banks to reduce run off and sediment load into the channel (b) Deliver additional bank erosion control work (putting matting on eroding banks by the allotments), marginal planting along the stream, tree thinning along Winterbourne Lane and additional habitat work (c) Deliver wetland features at Ashcombe House to slow and store water close to the source of the Winterbourne (d) Remove Invasive Non-Native Species from the channel (e) Finalise plans and designs for the Bell Lane concreted section, results from ground water monitoring to be included in decision making in enhancement options for this 500m section (e.g. remove the bed or install features within the concrete). Have approved designs ready for delivery (f) Engage community through various media to increase awareness and garnish support for future restoration works (g) Deliver water retention measures at Southover School (adjacent to Winterbourne) to engage with schools and reduce run off from carpark and playground. 26/27 (h) remove 100m of the concrete riverbed section adjacent to Bell Lane recreation ground to help with flooding and renaturalise a 125m section of the Lewes Winterbourne, creating an example of the potential for future restoration of heavily modified sections of the river both up and downstream |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Cement, Road |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
